Contractor: Hy Vee Construction

Date: Feb 4, 2004

Permit type: Commercial Contracting

Description: Description:name of subdivision : independence plaza. construct new storm sewers consisting of curb inlets: 2 ea 5'x4' 1 ea 6'x4' 2 ea 6'x5.5'; area inlet: 1 ea 4'x4'; pipe: 39 lf 15" cmp 123 lf 18" rcp 230 lf 21" rcp 69 lf 24" rcp 191 lf 36" rcp; 155 lf channel; 29 sy riprap; 4200 cy det. pond excavation; etc as shown in the approved drawings for the said subdivision located in jackson county of kansas citymissouri ( sec : 26-49-32 ). if this is checked we have received a bond or letter of credit from the developer to ensure the repair of any street due to the non use of standard required back fill material during the permitted construction of this storm sewer. before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work and agrees to provide unincumbered right-of-way or easement for the facility as required by ch66 code of ordinance or will remove/relocate facilities at developer's expense.

Client: Sundar Properties Llc

Parcel #: JA33540031200000000

Permit #: SEC0 1292

5820 Westown Parkway, West Des Moines, IA 50266

Contractor: Hy Vee Construction

Date: Feb 4, 2004

Permit type: Commercial Contracting

Description: Description:sub division : independence plaza. construct new sanitary sewer line consisting of 2 ea 4' dia std manholes 432 lf 8" pvc pipe with 6" wyes 96 lf 24" casing pipe 1 ea connection to existing manhole etc as shown in the approved drawings for the said sub division located in jackson county of kansas city missouri. ( sec : 26-49-32 ). before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work and agrees to provide unincumbered right-of-way or easement for the facility as required by ch66 code of ordinance or will remove/relocate facilities at developer's expense.

Client: Sundar Properties Llc

Parcel #: JA33540031200000000

Permit #: SEC0 1291

5820 Westown Parkway, West Des Moines, IA 50266

Contractor: Hy Vee Construction

Date: Dec 12, 2005

Permit type: Commercial Contracting

Description: Requirements:. the contractor may begin at the se corner of w 44th street and madison ave to occupy approx 655 feet of the east curb lane of 4400 block of madison ave. also contractor may occupy approx 125 feet of the south and north parking lanes between madison ave and alley. the contractor shall provide install and remove all signs barricades and channelization devices shown on the attached drawings. access to adjacent properties shall be maintained. all open excavations shall be plated and the street reopened to traffic during non-working hours. the contractor shall provide safe facilities for pedestrian traffic. the traffic control shall comply with part vi of the mutcd at all times. this permit must be on the job site at all times.

Parcel #: SEGMENT PARCEL

Permit #: SS15 32982

5820 Westown Parkway, West Des Moines, IA 50266

Contractor: Hy Vee Construction

Date: Jan 13, 2006

Permit type: Commercial Contracting

Description: Requirements:. contractor may park dumpster at the east curb lane of 4537 washington street. the contractor may park a dumpster at this location. the contractor shall provide reflective tape or type i barricade on all corners adjacent to traffic for visibility. traffic control shall comply with part vi of the mutcd at all times. a copy of this permit must be on the dumpster at all times.

Parcel #: JA30410144600000000

Permit #: SS15 33116

5820 Westown Parkway, West Des Moines, IA 50266

Contractor: Hy Vee Construction

Date: Jan 25, 2006

Permit type: Commercial Contracting

Description: Requirements:. contractor may park dumpster approx 30 feet south of e 9th street at the east sidewalk area of 909 walnut street. the contractor may park a dumpster at this location. the contractor shall provide reflective tape or type i barricade on all corners adjacent to traffic for visibility. traffic control shall comply with part vi of the mutcd at all times. a copy of this permit must be on the dumpster at all times.

Parcel #: JA29220330200000000

Permit #: SS15 33168

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Mar 22, 2006

Permit type: Commercial Contracting

Description: Name of subdivision :kings gate third plat construct new storm sewers consisting of:15" thru 30" hcmp 4050 l.f. 42" thru 48" rcp end section 682 l.f. 4' dia std mh 2 ea curb inlet 43 ea rip-rap 96 s.y. etc as shown in the approved drawings for the said subdivision located in clay county of kansas city missouri. (sec :17 51 32 ) x if this is checked we have received a bond or letter of credit from the developer to ensure the repair of any street due to the non use of standard required back fill material during the permitted construction of this storm sewer. before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work and agrees to provide unincumbered right-of-way or easement for the facility as required by ch66 code of ordinance or will remove/relocate facilities at developer's expense.

Parcel #: CL1440700010150001

Permit #: SEC4 70094026

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Mar 27, 2006

Permit type: Commercial Contracting

Description: Name of subdivision : kings gate third plat construct new storm sewers consisting of:6" pvc sch 40 106 l.f. 6" pvc sch40 perforated 116 l.f. 6" pvc ( tees cleanouts bends) 3 ea.36" & 54" rcp 131 l.f.36" & 54" rcp end section 4 ea field inlet 1 ea stone underdrain w/ fabric(boi-basins) 52 c.y. stacked stone channel(bio-basin) 135c.y. rip-rap 28 s.y. includes the grading for the detention basins and embankments etc as shown in the approved drawings for the said subdivision located in clay county of kansas city missouri. (sec :175232 this permit is conditional upon contractor paying additional fee's for the additional bond added to this permit within 8 days of the date of recieving bond amounts required. before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work and agrees to provide unincumbered right-of-way or easement for the facility as required by ch66 code of ordinance or will remove/relocate facilities at developer's expense.

Parcel #: T677.R1

Permit #: SEC4 70094031

5820 Westown Parkway, West Des Moines, IA 50266

Contractor: Hy Vee Construction

Date: Jun 12, 2006

Permit type: Commercial Contracting

Description: Requirements:. the contractor may close 660 feet of the sidewalk area on the eastside of 4400 madison ave and also may close 130 feet of the sidewalk area on the north side of 800 w 45th street. the contractor shall provide install and remove all signs barricades and channelization devices shown on the attached drawings. access to adjacent properties shall be maintained. all open excavations shall be plated and the street reopened to traffic during non-working hours. the contractor shall provide safe facilities for pedestrian traffic. the traffic control shall comply with part vi of the mutcd at all times. this permit must be on the job site at all times.

Parcel #: SEGMENT PARCEL

Permit #: SS15 33978

5820 Westown Parkway, West Des Moines, IA 50266

Contractor: Hy Vee Construction

Date: Jun 12, 2006

Permit type: Commercial Contracting

Description: Requirements:. the contractor may begin at the se corner of w 44th street and madison ave to occupy approx 655 feet of the east curb lane of 4400 block of madison ave. also contractor may occupy approx 125 feet of the south and north parking lanes between madison ave and alley. the contractor shall provide install and remove all signs barricades and channelization devices shown on the attached drawings. access to adjacent properties shall be maintained. all open excavations shall be plated and the street reopened to traffic during non-working hours. the contractor shall provide safe facilities for pedestrian traffic. the traffic control shall comply with part vi of the mutcd at all times. this permit must be on the job site at all times.

Parcel #: SEGMENT PARCEL

Permit #: SS15 33979

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Mar 26, 2008

Permit type: Commercial Contracting

Description: Name of subdivision :kings gate third plat construct new storm sewers consisting of:15" thru 30" hcmp 4050 l.f. 42" thru 48" rcp end section 682 l.f. 4' dia std mh 2 ea curb inlet 43 ea rip-rap 96 s.y. etc as shown in the approved drawings for the said subdivision located in clay county of kansas city missouri. (sec :17 51 32 ) x if this is checked we have received a bond or letter of credit from the developer to ensure the repair of any street due to the non use of standard required back fill material during the permitted construction of this storm sewer. before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work and agrees to provide unincumbered right-of-way or easement for the facility as required by ch66 code of ordinance or will remove/relocate facilities at developer's expense.

Parcel #: CL1440700010150001

Permit #: SEC0 4232

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Jun 13, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028c and contract no. 1 with work not starting prior to may15 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of 09-30-2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit; maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.

Parcel #: PL189030300001002000

Permit #: SEC3 70097151

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Jun 13, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028a and contract no. 2 with work not starting prior to may 15 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of august 30 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) if this is checked city has received a bond or letter of credit from the developer to ensure the repair of any street due to the non-use of standard required flowable backfill material during the permitted construction of this storm sewer. l) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.

Parcel #: PL189030300001002000

Permit #: SEC4 70097150

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Jun 13, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028a and contract no. 1 with work not starting prior to may 15th 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of september 30th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) if this is checked city has received a bond or letter of credit from the developer to ensure the repair of any street due to the non-use of standard required flowable backfill material during the permitted construction of this storm sewer. l) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.

Parcel #: PL189030300001002000

Permit #: SEC4 70097149

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Jul 18, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028c and contract no. 1 with work not starting prior to may15 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of 09-30-2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit; maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.

Parcel #: PL189030300001002000

Permit #: SEC9 2028

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Jul 25, 2008

Permit type: Commercial Contracting

Description: Where: in pavement in front of: street cut to be determined after completion of job. reason for trench excavation as follows: water main. trench linear feet on street(ave): on ne 106th terr and north congress. trenching for a total linear feet length of: 150'. anticipated schedule of work: start date: 7/25/08 completion date: 8/10/08. before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work.

Parcel #: Z2008

Permit #: SEEW 70161112

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Aug 12, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028b and contract no. 5 with work not starting prior to august 18th 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of august 22nd 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) x if this is checked city has received a bond or letter of credit from the developer to ensure the repair of any street due to the non-use of standard required flowable backfill material during the permitted construction of this storm sewer. l) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.

Parcel #: PL189030300001002000

Permit #: SEC4 70097296

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Aug 12, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028b and contract no. 6 with work not starting prior to september 1st 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of september 5th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) they have satisfied themselves that subgrade conditions are satisfactory and suitable for installation of the improvements proposed under the scope of this permit.

Parcel #: PL189030300001002000

Permit #: SEC5 70097301

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Aug 12, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028b and contract no. 1 with work not starting prior to august 13th 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of august 17th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) they have satisfied themselves that subgrade conditions are satisfactory and suitable for installation of the improvements proposed under the scope of this permit.

Parcel #: PL189030300001002000

Permit #: SEC5 70097299

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Aug 12, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028b and contract no. 4 with work not starting prior to august 18th 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of august 29th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) they have satisfied themselves that subgrade conditions are satisfactory and suitable for installation of the improvements proposed under the scope of this permit.

Parcel #: PL189030300001002000

Permit #: SEC5 70097300

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Aug 18, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028c and contract no. 1 with work not starting prior to may15 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of 09-30-2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit; maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.

Parcel #: PL189030300001002000

Permit #: SEC0 5149

6800 Lake Drive Suite 125, West Des Moines, IA 50266

Contractor: Mcaninch Corp

Date: Sep 3, 2008

Permit type: Commercial Contracting

Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028a and contract no. 7 (revised sheets cg-104 and cg-105) with work not starting prior to september 3rd 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of september 10th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) if this is checked city has received a bond or letter of credit from the developer to ensure the repair of any street due to the non-use of standard required flowable backfill material during the permitted construction of this storm sewer. l) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.

Parcel #: PL189030300001002000

Permit #: SEC4 70097370

5820 Westown Parkway, West Des Moines, IA 50266

Contractor: Hy Vee Construction

Date: Jan 15, 2010

Permit type: Commercial Contracting

Description: Requirements:. the contractor may begin south of e 49th street to occupy east parking lane of main street 200' south. the contractor shall provide install and remove all signs barricades and channelization devices shown on the attached drawings. access to adjacent properties shall be maintained. all open excavations shall be plated and the street reopened to traffic during non-working hours. the contractor shall provide safe facilities for pedestrian traffic. the traffic control shall comply with part vi of the mutcd at all times. this permit must be on the job site at all times. (renewal of permit # ss15-43207).

Parcel #: JA30530314200000000

Permit #: SS15 43891