Mcaninch Corp
4001 Delaware, Des Moines, IA 50313
Contact Information
Mcaninch Corp Additional Information Add Info
No additional information for Mcaninch Corp yet.
Reviews Write Review
No reviews for Mcaninch Corp yet.
Permits (14)
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Sep 3, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028a and contract no. 7 (revised sheets cg-104 and cg-105) with work not starting prior to september 3rd 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of september 10th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) if this is checked city has received a bond or letter of credit from the developer to ensure the repair of any street due to the non-use of standard required flowable backfill material during the permitted construction of this storm sewer. l) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.
Parcel #: PL189030300001002000
Permit #: SEC4 70097370
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Aug 18, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028c and contract no. 1 with work not starting prior to may15 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of 09-30-2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit; maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.
Parcel #: PL189030300001002000
Permit #: SEC0 5149
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Aug 12, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028b and contract no. 1 with work not starting prior to august 13th 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of august 17th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) they have satisfied themselves that subgrade conditions are satisfactory and suitable for installation of the improvements proposed under the scope of this permit.
Parcel #: PL189030300001002000
Permit #: SEC5 70097299
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Aug 12, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028b and contract no. 4 with work not starting prior to august 18th 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of august 29th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) they have satisfied themselves that subgrade conditions are satisfactory and suitable for installation of the improvements proposed under the scope of this permit.
Parcel #: PL189030300001002000
Permit #: SEC5 70097300
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Aug 12, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028b and contract no. 6 with work not starting prior to september 1st 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of september 5th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) they have satisfied themselves that subgrade conditions are satisfactory and suitable for installation of the improvements proposed under the scope of this permit.
Parcel #: PL189030300001002000
Permit #: SEC5 70097301
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Aug 12, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028b and contract no. 5 with work not starting prior to august 18th 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of august 22nd 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) x if this is checked city has received a bond or letter of credit from the developer to ensure the repair of any street due to the non-use of standard required flowable backfill material during the permitted construction of this storm sewer. l) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.
Parcel #: PL189030300001002000
Permit #: SEC4 70097296
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Jul 25, 2008
Permit type: Commercial Contracting
Description: Where: in pavement in front of: street cut to be determined after completion of job. reason for trench excavation as follows: water main. trench linear feet on street(ave): on ne 106th terr and north congress. trenching for a total linear feet length of: 150'. anticipated schedule of work: start date: 7/25/08 completion date: 8/10/08. before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work.
Parcel #: Z2008
Permit #: SEEW 70161112
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Jul 18, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028c and contract no. 1 with work not starting prior to may15 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of 09-30-2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit; maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.
Parcel #: PL189030300001002000
Permit #: SEC9 2028
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Jun 13, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028c and contract no. 1 with work not starting prior to may15 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of 09-30-2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit; maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.
Parcel #: PL189030300001002000
Permit #: SEC3 70097151
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Jun 13, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028a and contract no. 1 with work not starting prior to may 15th 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of september 30th 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) if this is checked city has received a bond or letter of credit from the developer to ensure the repair of any street due to the non-use of standard required flowable backfill material during the permitted construction of this storm sewer. l) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.
Parcel #: PL189030300001002000
Permit #: SEC4 70097149
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Jun 13, 2008
Permit type: Commercial Contracting
Description: By accepting this permit permittee acknowledges the following: a) that time is of the essence; b) they have satisfied themselves that the owner has provided satisfactory r/w and/or easement(s) in accordance with city code to accommodate the work; c) to give city & adjacent residents 48 hrs advance notice prior to starting work; d) to construct the improvements as indicated on the permit plan record documents under plan file no. 2008-028a and contract no. 2 with work not starting prior to may 15 2008; (city agrees to early issuance of this permit subject to applicant agreeing to pay a double permit fee if work is started before the start date indicated herein); e) to complete this work by the permit completion date of august 30 2008; f) to coordinate with the work of all other contractors for timely completion; g) to remove/relocate/reconstruct unacceptable work to the satisfaction of the city; h) to remain responsible for the work until permit and bond are released; i) the city will notify the permittee by letter when the maintenance period starts if applicable under the provisions of the bond for this permit. maintenance shall include any and all repairs to damaged components of the facility that may have occurred prior to or during the maintenance period; j) the city will notify the permittee by letter when this permit and the facility constructed under it are final accepted. final acceptance shall not occur until the maintenance period required under the bond has been completed and all maintenance items addressed. k) if this is checked city has received a bond or letter of credit from the developer to ensure the repair of any street due to the non-use of standard required flowable backfill material during the permitted construction of this storm sewer. l) the permittee has been informed and understands that this permit obligates the permittee (principal under the bond) to provide as-built records as a condition of satisfying the bond performance obligations under this permit even if the design engineer has designated themselves to this obligation on the plans but has not done so. the permittee hereunder will be given 30 days notice to provide said as-builts.
Parcel #: PL189030300001002000
Permit #: SEC4 70097150
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Mar 26, 2008
Permit type: Commercial Contracting
Description: Name of subdivision :kings gate third plat construct new storm sewers consisting of:15" thru 30" hcmp 4050 l.f. 42" thru 48" rcp end section 682 l.f. 4' dia std mh 2 ea curb inlet 43 ea rip-rap 96 s.y. etc as shown in the approved drawings for the said subdivision located in clay county of kansas city missouri. (sec :17 51 32 ) x if this is checked we have received a bond or letter of credit from the developer to ensure the repair of any street due to the non use of standard required back fill material during the permitted construction of this storm sewer. before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work and agrees to provide unincumbered right-of-way or easement for the facility as required by ch66 code of ordinance or will remove/relocate facilities at developer's expense.
Parcel #: CL1440700010150001
Permit #: SEC0 4232
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Mar 27, 2006
Permit type: Commercial Contracting
Description: Name of subdivision : kings gate third plat construct new storm sewers consisting of:6" pvc sch 40 106 l.f. 6" pvc sch40 perforated 116 l.f. 6" pvc ( tees cleanouts bends) 3 ea.36" & 54" rcp 131 l.f.36" & 54" rcp end section 4 ea field inlet 1 ea stone underdrain w/ fabric(boi-basins) 52 c.y. stacked stone channel(bio-basin) 135c.y. rip-rap 28 s.y. includes the grading for the detention basins and embankments etc as shown in the approved drawings for the said subdivision located in clay county of kansas city missouri. (sec :175232 this permit is conditional upon contractor paying additional fee's for the additional bond added to this permit within 8 days of the date of recieving bond amounts required. before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work and agrees to provide unincumbered right-of-way or easement for the facility as required by ch66 code of ordinance or will remove/relocate facilities at developer's expense.
Parcel #: T677.R1
Permit #: SEC4 70094031
6800 Lake Drive Suite 125, West Des Moines, IA 50266
Date: Mar 22, 2006
Permit type: Commercial Contracting
Description: Name of subdivision :kings gate third plat construct new storm sewers consisting of:15" thru 30" hcmp 4050 l.f. 42" thru 48" rcp end section 682 l.f. 4' dia std mh 2 ea curb inlet 43 ea rip-rap 96 s.y. etc as shown in the approved drawings for the said subdivision located in clay county of kansas city missouri. (sec :17 51 32 ) x if this is checked we have received a bond or letter of credit from the developer to ensure the repair of any street due to the non use of standard required back fill material during the permitted construction of this storm sewer. before commencing work the permitee herein will give 24 hours notification to residents adjacent to work area of the scope and estimated duration of the work and agrees to provide unincumbered right-of-way or easement for the facility as required by ch66 code of ordinance or will remove/relocate facilities at developer's expense.
Parcel #: CL1440700010150001
Permit #: SEC4 70094026