Contractors DirectoryInformation on every contractor in United States

Remodeling Permits in Toledo, OR

4610 Elk City Rd, Toledo, OR 97391

Contractor: Luckini Construction

Date: Feb 5, 2015

Permit type: Remodeling

Description: Warfield: new shop warfield: new shop

Client: Warfield Trina Y Trustee

Parcel #: 11-10-09-00-01209-00

Permit #: 519-15-000154-STR

209 Schlecht Rd, Toledo, OR 97391

Contractor: Cascade Coast Construction Inc

Date: Feb 18, 2015

Permit type: Remodeling

Description: Searle: remodel searle: remodel

Client: Searle Brenda

Parcel #: 11-10-19-00-02100-00

Permit #: 519-15-000250-STR

4 Olalla Pl, Toledo, OR 97391

Date: Apr 27, 2015

Permit type: Remodeling

Description: Addition of deck/enclose porch enclose rear porch to expand closet and construct 3'-4' x 30' deck on the north side of dwelling.

Valuation: $200,000

Client: Bachart Sheryl M

Parcel #: 10-10-32-D0-02100-00

Permit #: 519-15-000768-STR

4 Olalla Pl, Toledo, OR 97391

Date: Apr 28, 2015

Permit type: Remodeling

Description: Lease: enclose porch to expand closet enclose rear porch to expand closet and construct 3'-4"x30' deck on the north side of dwelling

Client: Joseph Lease & Sandra Jouglard

Parcel #: 10-10-32-D0-02100-00

Permit #: 519-15-000781-STR

622 Se 7Th St, Toledo, OR 97391

Contractor: Robert Lee Rook

Date: Apr 30, 2015

Permit type: Remodeling

Description: Bone/hays: structural window replacement install (2) 6'-0x1'-4" horizontal windows. one in living room, one in bedroom. about 5'-6" from floor to sill.

Valuation: $100,000

Fee: $63.94 paid to State of Oregon

Client: Bone Kitty Ralphael

Parcel #: 11-10-17-CA-10200-00

Permit #: 519-15-000796-STR

1800 Ne Sturdevant Rd, Toledo, OR 97391

Date: Mar 3, 2016

Permit type: Remodeling

Description: Toledo high school gym rehabilitation the scope of this project consists of the complete seismic rehabilitation of a gymnasium and an adjacentbuilding: locker rooms/offices/mechanical room (originally wood shop). the rehabilitation will be accomplishedby means of adding, strengthening, and replacing lateral force resisting system elements where necessary,and by ensuring a proper load path to the foundation elements. for the gymnasium, the rehabilitation will beaccomplished by seismically isolating from adjacent building, replacing existing roof with a new steel roofdiaphragm, bracing out-of-plain existing concrete shear wall, adding two new concrete shear walls, adding astorage building for out-of-plain concrete shear wall bracing. for the building-a, the rehabilitation will beaccomplished by replacing roof sheathing to strengthen existing diaphragm and adding a new concrete shearwall. installation of new force transfer mechanisms in the form of wall anchors to diaphragms, along withnecessary gravity system renovations, will accompany the rehabilitation to bring the gymnasium and building-aback up to code accepted performance levels. the g.c. is responsible for all aspects of constructionnecessary for the completion of all work incidental to the work illustrated in this plan set.

Valuation: $110,000,000

Client: Lincoln Co School

Parcel #: 11-10-08-A0-02900-00

Permit #: 519-16-000772-STR

1400 Se Butler Bridge Rd, Toledo, OR 97391

Contractor: H3o Inc

Date: Apr 12, 2016

Permit type: Remodeling

Description: Georgia pacific toledo install 18' x 12' modular office building

Client: Georgia Pacific Toledo Llc

Parcel #: 11-10-17-00-01400-00

Permit #: 519-16-001085-STR

All data is collected from public records. We do not guarantee accuracy of information.