4610 Elk City Rd, Toledo, OR 97391
Contractor: Luckini Construction
Date: Feb 5, 2015
Permit type: Remodeling
Description: Warfield: new shop warfield: new shop
Client: Warfield Trina Y Trustee
Parcel #: 11-10-09-00-01209-00
Permit #: 519-15-000154-STR
209 Schlecht Rd, Toledo, OR 97391
Contractor: Cascade Coast Construction Inc
Date: Feb 18, 2015
Permit type: Remodeling
Description: Searle: remodel searle: remodel
Client: Searle Brenda
Parcel #: 11-10-19-00-02100-00
Permit #: 519-15-000250-STR
4 Olalla Pl, Toledo, OR 97391
Date: Apr 27, 2015
Permit type: Remodeling
Description: Addition of deck/enclose porch enclose rear porch to expand closet and construct 3'-4' x 30' deck on the north side of dwelling.
Valuation: $200,000
Client: Bachart Sheryl M
Parcel #: 10-10-32-D0-02100-00
Permit #: 519-15-000768-STR
4 Olalla Pl, Toledo, OR 97391
Date: Apr 28, 2015
Permit type: Remodeling
Description: Lease: enclose porch to expand closet enclose rear porch to expand closet and construct 3'-4"x30' deck on the north side of dwelling
Client: Joseph Lease & Sandra Jouglard
Parcel #: 10-10-32-D0-02100-00
Permit #: 519-15-000781-STR
622 Se 7Th St, Toledo, OR 97391
Contractor: Robert Lee Rook
Date: Apr 30, 2015
Permit type: Remodeling
Description: Bone/hays: structural window replacement install (2) 6'-0x1'-4" horizontal windows. one in living room, one in bedroom. about 5'-6" from floor to sill.
Valuation: $100,000
Fee: $63.94 paid to State of Oregon
Client: Bone Kitty Ralphael
Parcel #: 11-10-17-CA-10200-00
Permit #: 519-15-000796-STR
1800 Ne Sturdevant Rd, Toledo, OR 97391
Date: Mar 3, 2016
Permit type: Remodeling
Description: Toledo high school gym rehabilitation the scope of this project consists of the complete seismic rehabilitation of a gymnasium and an adjacentbuilding: locker rooms/offices/mechanical room (originally wood shop). the rehabilitation will be accomplishedby means of adding, strengthening, and replacing lateral force resisting system elements where necessary,and by ensuring a proper load path to the foundation elements. for the gymnasium, the rehabilitation will beaccomplished by seismically isolating from adjacent building, replacing existing roof with a new steel roofdiaphragm, bracing out-of-plain existing concrete shear wall, adding two new concrete shear walls, adding astorage building for out-of-plain concrete shear wall bracing. for the building-a, the rehabilitation will beaccomplished by replacing roof sheathing to strengthen existing diaphragm and adding a new concrete shearwall. installation of new force transfer mechanisms in the form of wall anchors to diaphragms, along withnecessary gravity system renovations, will accompany the rehabilitation to bring the gymnasium and building-aback up to code accepted performance levels. the g.c. is responsible for all aspects of constructionnecessary for the completion of all work incidental to the work illustrated in this plan set.
Valuation: $110,000,000
Client: Lincoln Co School
Parcel #: 11-10-08-A0-02900-00
Permit #: 519-16-000772-STR
1400 Se Butler Bridge Rd, Toledo, OR 97391
Contractor: H3o Inc
Date: Apr 12, 2016
Permit type: Remodeling
Description: Georgia pacific toledo install 18' x 12' modular office building
Client: Georgia Pacific Toledo Llc
Parcel #: 11-10-17-00-01400-00
Permit #: 519-16-001085-STR