Contractors DirectoryInformation on every contractor in United States

Plumbing Permits in Tucson, AZ

4263 E Ocotillo Desert Tr, Tucson, AZ 85715

Date: Jul 20, 2015

Permit type: Plumbing

Description: House fire

Parcel #: 140323620

Permit #: T15DV05286

2791 W Saint Tropaz Av, Tucson, AZ 85713

Date: Jul 20, 2015

Permit type: Plumbing

Description: (1) 5x5 & (1) 2x10 trench in dirt alley in rear of property to replace gas line - lane request is for 7/21/15

Permit #: T15EX02207

3758 S Grady Pl, Tucson, AZ 85730

Date: Jul 21, 2015

Permit type: Plumbing

Description: (2) in dirt alley in rear of property to relocate gas line - alley request is for 7/21/15

Permit #: T15EX02229

8220 E Woodland Rd, Tucson, AZ 85749

Date: Jul 21, 2015

Permit type: Plumbing

Description: (2) 5 x 5 in dirt in front of property - to relocate gas line

Permit #: T15EX02226

7370 S Madera Village Dr, Tucson, AZ 85716

Contractor: Darcy Tokraks

Date: Jul 21, 2015

Permit type: Plumbing

Description: Replace 50 gal gas water heater like for like (vh)

Parcel #: 141112800

Permit #: T15PL00091

7752 E Camino Bavispe, Tucson, AZ 85715

Date: Jul 22, 2015

Permit type: Plumbing

Description: 3-8'x4'x6' excavations to replace broken sewer house connection with new connections. total length of excavation will be 24 ft. all removed asphalt to be replaced to match existing.

Permit #: T15EX02241

7752 E Camino Bavispe, Tucson, AZ 85715

Date: Jul 22, 2015

Permit type: Plumbing

Description: 3-8'x4'x6' excavations to replace broken sewer house connection with new connections. total length of excavation will be 24 ft. all removed asphalt to be replaced to match existing.

Permit #: T15TC01723

2592 N Avenida San Valle, Tucson, AZ 85715

Date: Jul 22, 2015

Permit type: Plumbing

Description: Sewer rehabilitation no excavating

Permit #: T15TC01724

5910 E Ryan Pl, Tucson, AZ 85712

Date: Jul 22, 2015

Permit type: Plumbing

Description: Repl gas line

Parcel #: 12101041C

Permit #: T15CM05069

2819 N Woodland Av #01, Tucson, AZ 85715

Date: Jul 22, 2015

Permit type: Plumbing

Description: Compliance permit 2 units on 10,000sqft

Parcel #: 11009065E

Permit #: T15CM05047

3784 N Warren Av, Tucson, AZ 85715

Contractor: Raindance Plumbing Llc

Date: Jul 22, 2015

Permit type: Plumbing

Description: Repl gasline;res

Parcel #: 113011680

Permit #: T15CM05075

2771 N Essel Dr, Tucson, AZ 85715

Date: Jul 23, 2015

Permit type: Plumbing

Description: Sewer rehabilitation - no excavation. complete closure with detour route.

Permit #: T15TC01730

1538 W Kilburn St, Tucson, AZ 85756

Contractor: Mr Rooter Of Tucson

Date: Jul 24, 2015

Permit type: Plumbing

Description: Repl drain lines

Parcel #: 106122360

Permit #: T15CM05117

1051 N Tyndall Av, Tucson, AZ 85719

Date: Jul 27, 2015

Permit type: Plumbing

Description: Tricon contracting inc. will be doing a 6" & 8" main, 2 fire hydrants, fire services, and new water services. a total of 256 feet in asphalt. work order # 2410

Permit #: T15TC01743

6942 E Hacienda Reposo, Tucson, AZ 85715

Date: Jul 27, 2015

Permit type: Plumbing

Description: Repl wtr htr (apa)

Parcel #: 133143330

Permit #: T15CM05174

5373 S Oakhaven Dr, Tucson, AZ 85715

Contractor: Darcy Tokraks

Date: Jul 27, 2015

Permit type: Plumbing

Description: Replace 40 gal water heater like for like (vh)

Parcel #: 137312220

Permit #: T15PL00092

2590 W Chamberlain St, Tucson, AZ 85745

Date: Jul 27, 2015

Permit type: Plumbing

Description: Repl wtr htr (apa)

Parcel #: 116027460

Permit #: T15CM05176

10029 E Leila Dr, Tucson, AZ 85730

Date: Jul 27, 2015

Permit type: Plumbing

Description: Repl wtr htr (apa)

Parcel #: 136413650

Permit #: T15CM05175

3686 E Baker Pl, Tucson, AZ 85716

Date: Jul 27, 2015

Permit type: Plumbing

Description: Work without permits. rear porch and fireplace built without permits.

Parcel #: 125112620

Permit #: T15DV05531

6241 E 15Th St, Tucson, AZ 85715

Date: Jul 27, 2015

Permit type: Plumbing

Description: New split system/gas

Parcel #: 128020830

Permit #: T15CM05141

All data is collected from public records. We do not guarantee accuracy of information.