Contractors DirectoryInformation on every contractor in United States

New Construction Permits in Summerfield, NC

7012 Pearson Run Ct, Summerfield, NC 27358

Contractor: Redmon Plumbing

Date: May 11, 1999

Permit type: New Construction

Description: 1.5 story sfr/4 bdrm/garage/porch/deck/septic 9905604/ *community well/lot 16/wilson farm/bruce twp/vol 7/lj * * 05-11-99 application for soil evaulation for lot 16 @ 0.88ac /wilson farm sub/preliminary plat by mayor of summerfield/ rs30/community water ...ame 05-11-99 sent to surveyor: hugh creed assoc @ 275-9826..ame layout 7-26-02/gw plans submitted 7-26-02/contact r & k investment properties /mike lemons/code 7568/643-3503 or 382-1822/gw application for temp power on file in main office bobby foster's desk 7-26-02/gw plan reviewed by jcl 08-14-02 8-28-20 keyed ss to duke/gso/smw 11-19-02 rel rough to gso/dk @ 9:45 per 160...ih 1/27/03 keyed 30 temp power to gso duke. ke released to png/gbo susan 1-29-03/gw 1/29/03 keyed final to gso duke. printed & mailed co.ke

Valuation: $2,385,240,000

Fee: $2,294.80 paid to Guilford County, North Carolina

Client: R & K Investment Properties

Permit #: H0116359RBLD

7820 Wilson Farm Rd, Summerfield, NC 27358

Contractor: J & B Builders, Inc.

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/garage/front porch/bonus room/deck/lot 60 *wilson farm/septic 9905602/cs * * 5/12/99 approved preliminary plat lot 60, .850acs. wilson farm sub. sessoms development inc mayor of summer/gm 05-20-99 sent to hlth ....ame layout 5-11-01/gw plans submitted 5-11-01/contact j & b builders inc/bill parks/code 6874/362-1928/gw plan review by jcl 5-25-01 6/14/01- keyed ss to duke/g @ 10:54am - cs 6/20/01 keyed ss to gs/dke per 129 may hve been relocated/zh 6/20/01 - billed j&b for 2nd failed 120/cs 9/12/01 - billed williamson for 2nd failed 230/cs 9/14/01 - billed williamson for 3rd failed 230/cs 9-18-01 rel rough to gso/dk @ 8:28 per 160..ih 9/19/01 - billed builders firepl for 2nd failed 240/cs 9/21/01 - insulation mecheck on file. 155/cs 10/5/01 - billed builders fireplace for 2nd failed 240/cs 11/9/01 - keyed 30 day for const use only to duke/g @ 9:56am per 160/cs 11/21/01 - billed williamson for 004x2 on 425 per 177/cs 11/26/01 - billed bldrs fireplace for 4th failed 240/cs 11/27/01 - rel to png/g susan @ 9:34am - cs keyed final to gbo duke and printed co 11-29-01/gw

Valuation: $1,507,420,000

Fee: $1,446.40 paid to Guilford County, North Carolina

Client: J & B Builders Inc

Permit #: H0116367RBLD

7813 Wilson Farm Rd, Summerfield, NC 27358

Contractor: Clayton, Tony Pearson

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/garage/porch/deck/septic 9905622/community well *lot 24/wilson farm sub/bruce t/ * * 05-12-99 application for soil evaulation for lot 24 @0.71ac /wilson farm sub/preliminary plat by mayor of summerfield/ rs30/community water ...ame 05-12-99 sent to surveyor: hugh creed assoc. @275-9826..ame 05-27-99 sent to hlth ...ame 9/20/00 - plans submitted/perennial properties contact james yopp 644-0532 - cs plan reviewed kwc 09-28-00 3/9/01 - keyed ss to duke/g @ 9:47am - cs 3/15/01 - keyed ss again to duke/g as they are claiming it was not received on 3/9/01 (9:19am) - cs 5/2/01 roger w/mastin chtg & clg is mech & fuel ppng con/zh 5-7-01/changed plumbing contractor to edward christian via phone from mr. christian/smw. 5/8/01 - keyed rough to duke/g @ 10:43am - cs david hatfield not doing plumbing on this sfr/5-11-01/gw 5/29/01 - insulaiton mecheck on file. cs 6/18/01...keyed 30day temp power to gso duke per 163/gmh billed mastin heating & cooling 35.00 fee for 2nd fail 230 inspection 8-8-01/gw billed edward christian plumbing for 2nd failed 325 inspection 10-9-01/gw 10/12/01 - per 177 plub cont is tony clayton (4361)/cs 10/26/01 - rel to png/g susan @ 9:27am - cs keyed final to gbo duke and printed co 7-25-02/gw

Valuation: $1,455,960,000

Fee: $1,334.50 paid to Guilford County, North Carolina

Client: Perennial Properties

Permit #: H0116390RBLD

7815 Wilson Farm Rd, Summerfield, NC 27358

Contractor: Gentry Air, Inc.

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/garage/deck/porch/lot 33 @ .79ac/bruce twp/ih * * * 05-12-99 application for soil evaulation for lot 33 @ .79ac /wilson farm sub/preliminary plat by mayor of summerfield/ rs30/community water ...ame 05-12-99 sent to surveyor: hugh creed assoc. @ 275-9826..ame 05-27-99 sent to hlth ...ame plan reviewed by jcl 05-11-01, refer to permit #117166 5/23/01 keyed ss to gso/duke--zh 7/20/01...keyed rough to gso duke /gmh 7/25/01 - per 177 plumb cont now jarrett gas (7000)/cs 8/3/01 - insulation mecheck on file downtown. 155/cs keyed 30 day temp to gbo duke for const use only 8-9-01/gw 10/11/01 - rel to png/g susan @ 10:40am - cs 11/6/01 keyed final to gso/duke, issued & mailed co--zh

Valuation: $2,064,020,000

Fee: $1,435.70 paid to Guilford County, North Carolina

Client: Sessoms Development, Inc

Permit #: H0116409RBLD

7816 Wilson Farm Rd, Summerfield, NC 27358

Contractor: Hatfield Plumbing & Repair Service

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/garage/porch/deck/bonus room/septic 9905611/ *community well/lot 62/wilson farm sub/bruce t/ * * 5/12/99 approved preliminary plat lot 62, .799acs. wilson farm sub. sessoms development inc mayor of summer/gm 05-20-99 sent to hlth ...ame layout 9-18-00/gw plans submitted 9-18-00/contact contractor mark locke or james yopp/code 7925/395-0042/gw plan reviewed kwc 09-25-00 computer showing 280.00 paid to health dept 10-20-00/gw health dept took 110.00 for septic permit 8-2-00/gw 10/30/00 - keyed ss to duke/g @ 8:33am - cs 1/11/01 - keyed rough to duke/g @ 9:41am = cs 1/31/01 - insulation mecheck on file. cs 4/6/01...keyed 30day temp power to gso duke not to occupy for construction use only...163/gmh 4/6/01..billed $30 c & m elect. for reinspect. fee 163/gmh 4/9/01..rekeyed 30day temp power to gso duke/gmh 4/901 - rel to png/g shawn @ 11:35am - cs keyed final to gbo duke and printed co, also released gas to gso png per susan 4-23-01/smw.

Valuation: $1,925,000,000

Fee: $1,477.50 paid to Guilford County, North Carolina

Client: Perennial Properties Inc

Permit #: H0116379RBLD

7818 Wilson Farm Rd, Summerfield, NC 27358

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/garage/porch/deck/septic 9905603/community well *lot 61/wilson farm sub/bruce t/ * * 5/12/99 approved preliminary plat lot 61, .737acs. wilson farm sub. sessoms development inc mayor of summer/gm 05-20-99 sent to hlth ...ame already have health permit but layout on plot plan setback are different/layout 12-18-00/gw plans submitted 12-18-00/contact jon slaughter/bradys drywall 382-6283/gw plan reviewed kwc 12-28-00 1/9/01 rel ss to gso/duke @ 8:50--zh 2/13/01 - rel rough to duke/g @ 11:06am - cs 2/15/01 - insulation mecheck on file. 155/cs 3/14/01 - per builder gas log contrct is james aliff.cs 3/16/01 - rel to png/g susan @ 1:42pm - cs 3/20/01 - per 160 ok for 30 day temp for constrct. use only. keyed to duke/g @ 9:46am - cs 3-23-01 billed brady's drywall $30 for 3rd failed 130 per 155..ih 3/27/01 - printed & mailed co. keyed final to duke/g @ 8:35am - cs 3-27-01 faxed copy of co to # 545-2933..ih 04-18-01--rec. check #1210 for $30 from brady's drywall dba jordan homes/sm

Valuation: $1,095,720,000

Fee: $973.10 paid to Guilford County, North Carolina

Client: Brady's Drywall

Permit #: H0116369RBLD

7003 Austin Creek Dr, Summerfield, NC 27358

Contractor: Rivenbark Electric Co

Date: May 12, 1999

Permit type: New Construction

Description: 1 story sfr/garage/deck/porch/wilson farm sub/community *well/septic 995623/cs * * 05-12-99 application for soil evaulation for lot 25 @ 1.85ac /wilson farm sub/preliminary plat by mayor of summerfield /rs30/community water ...ame 05-12-99 sent to surveyor: hugh creed assoc @ 275-9826..ame 05-27-99 sent to hlth ...ame plans submitted 3-16-01/contact building demensions inc susan or paul mowery 215-7958 or 662-8867/gw heath ward health dept called 3-20-01 and said left setback can be 34' from left property line ok with him/gw 1 zone nat'l gas and 1 set of logs 4/12/01 - keyed ss to duke/g @ 9:30am - cs 5-10-01..builders fireplace added to install gas logs only via tammy/smw. 5/24/01 - keyed rough to duke/g @ 9:04am - cs keyed 30 day temp to gbo duke for const use only 7-13-01/gw 8/1/01 - rel to png/g sybil @ 8:30am - cs keyed final to gbo duke and printed co 8-10-01/gw

Valuation: $1,139,420,000

Fee: $973.50 paid to Guilford County, North Carolina

Client: Building Demensions Inc

Permit #: H0116391RBLD

7010 Pearson Run Ct, Summerfield, NC 27358

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/garage/porch/deck/septic 9905607/community well *lot 17/wilson farm sub/bruce t/ * * 05-12-99 application for soil evaulation for lot 17 @ .72 ac /wilson farm sub/preliminary plat by mayor of summerfeild/ rs30/community water ....ame 05-12-99 sent to surveyor: hugh creed assoc. @ 275-9826..ame layout 2-20-01/gw plans submitted 02-20-01/contact r & k investment properties troy green 669-0296/gw 02-27-01--on hold for piedmont wholesale layout/jcl re-submitted piedmont wholesale layout 4-4-01/attn: jim langford/gw plan reviewed by jcl 04-06-01 4/27/01 - keyed ss to duke/g @ 10:35am- sc plans re-submitted 5-14-01/to be stamp again/original plans were stolen from box/send back to nw office/gw plan re-stamped by jcl 05-21-01..(piedmont wholesale layouts need to be provided for field inspection and attached to plans). 7/23/01---aaron of air concepts heat. & air called to say they were doing the gas logs, when making inspec.---ff keyed elec rough to gbo duke 8-10-01/gw keyed 14 day temp to gbo duke for const use only 10-19-01/gw released to png/gbo susan 11-5-01/gw 11/5/01 per keyed final to gso/duke, issued & mailed co--zh

Valuation: $1,316,980,000

Fee: $1,108.50 paid to Guilford County, North Carolina

Client: R & K Investment Properties

Permit #: H0116374RBLD

7825 Wilson Farm Rd, Summerfield, NC 27358

Contractor: Wade's Oil Company, Inc.

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/garage/porch/septic 9905645/community well/ *lot 38/wilson farm sub/oak ridge t/deed ok * * 05-12-99 application for soil evaulation for lot 38 @ .87ac /wilson farm sub/preliminary plat by mayor of summerfield/ rs30/community water ....ame 05-12-99 sent to surveyor: hugh creed assoc. @275-9826..ame layout 1-23-01/gw plans submitted 1-23-01/contact northwest builders inc/ larry mckensie 644-6926/gw plan reviewed kwc 1-24-01 setback change on this permit per donnie newton is 65' front setback and 16' left off set 2-21-01/gw 3/27/01 - keyed ss to duke/g @ 9:46am -cs 10/18/01 billed enerfy & accent $30 f/2nd fail 240--zh 10/22/01 - keyed 30 day temp for construction use only to duke/g @ 9:12am- cs 11/7/01 -rel to png/g susan @ 2:15pm - cs 11/14/01 received ck#042534 from energy & accent in the amount of $65.00...$30.00 designated for #116420 & $35.00 for #116596, forward to tax for processing/tmb. 11/20/01 - per 129 rel to duke/g @ 12:34pm for ext temp power. cs 12/6/01 - keyed 15 day ext to duke/g @ 9:29am per 129/cs 12/21/01 - keyed 30 day ext to duke/g @ 8:21am - cs 1/24/02 - keyed 30 day ext to duke/g @ 8:28am - cs 2/26/02 - keyed 30 day ext to duke/g @ 10:41am - cs 3/26/02 - keyed 30 day ext to duke/g @ 10:45am- cs 4/30/02 - keyed 30 day ext to duke/g @ 12:36pm- cs 05-31-02 keyed 30 day ext to dk/gso. lj 06-14-02 all finals passed, all fees paid, issued and mailed co. keyed final power to dk/gso. lj

Valuation: $1,601,720,000

Fee: $1,328.20 paid to Guilford County, North Carolina

Client: Northwest Builders Corp

Permit #: H0116420RBLD

7009 Austin Creek Dr, Summerfield, NC 27358

Contractor: Wade's Oil Company, Inc.

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/decks/porches/bruce twp/lot 28 @ .79ac..ih * * * 05-12-99 applicationfor soil evaulation for lot 28 @ .79ac /wilson farm sub/preliminary plat by mayor of summerfield/ rs30/community water ....ame 05-12-99 sent to surveyor: hugh creed assoc @ 275-9826..ame 05-27-99 sent to hlth ...ame 3-22-01 lay out for new sfr..ih 3-22-01 submitting plans for new sfr.contact ronnie johnson @ 644-6801...ih plan reviewed by jcl 04-10-01 keyed ss to gbo duke 4=19-01/gw 6/11/01 - per 177 mech contr is wade's heating 1915/also is fuel pipe contractor. cs 6/12/01 - keyed rough to duke/g @ 11:39am - cs billed northgate builders 30.00 extra trip fee of 30.00 6-14-01/gw 6/18/01...keyed 30day temp power to gso duke per 163/gmh 9/24/01 - rel to png/g susan @ 9:02am - cs 11-29-01 keyed final power to duke/gso, printed and mailed co/smw

Valuation: $1,546,980,000

Fee: $1,224.30 paid to Guilford County, North Carolina

Client: Sessoms Development, Inc

Permit #: H0116398RBLD

7819 Wilson Farm Rd, Summerfield, NC 27358

Contractor: T R N Builders

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/garage/lot 35/wilson farms/septic 9905641/ *2 porches/community water/summerfield twp/cs * * 05-12-99 application for soil evaulation for lot 35 @.99ac /wilson farm sub/preliminary plat by mayor of summerfield/ rs30/community water ....ame 05-12-99 sent to surveyor: hugh creed assoc. @ 275-9826..ame 2/16/10 - plans submitted/trn builders/contact maureen mcbride 669-7437/code 8277/cs plan reviewed kwc 2-26-01 2/27/01 - sfr will have 2 zone nat'l gas system/cs 3/6/01 rel ss to gso/duke @ 9:01--zh 3/27/01 - billed trn for 2nd failed 120/cs 4/12/01 - billed trn for 2nd failed 127.cs 4/17/01 - per 123 fuel pipe contr is air providers (7952)cs also mech contr is air providers.cs 4/24/01 - per 123 plumb contr woody's plumb we do not have a listing for them. 123/cs 4/24/01 - keyed rough to duke/g @ 10:16am - cs 4/26/01 - billed trn for failed 127/cs 4/26/01 - e christian is plumb contractor (8310)/cs 5/10/01 - billed trn for 2nd failed 126/cs 7/18/01 maureen from mcbride homes called to list farron welborn is plumbing contractor--zh keyed 30 day temp to gbo duke for const use only 8-13-01/gw 8/24/01 - rel to png/g alice @ 8:55am - cs 9-19-01 bill'd trn builders $30 for 130 ...ih 9-28-01 bill'd trn $30 for 3rd failed 130 per 142.....ih 10/11/01 - billed trn bldrs for 4th failed 130/cs 10-23-01--keyed final, rel. pwr. to gso/dk, issued co & & closed permit/sm 11/06/01 received ck#2815 from trn bldrs. in the amount of $30.00 forward to tax dept for processing/tmb

Valuation: $1,792,160,000

Fee: $1,529.00 paid to Guilford County, North Carolina

Client: Trn Builders

Permit #: H0116414RBLD

7007 Austin Creek Dr, Summerfield, NC 27358

Contractor: Wade's Oil Company, Inc.

Date: May 12, 1999

Permit type: New Construction

Description: 2 story sfr/garage/porch/lot 27/wilson farm sub/bruce twp/ *community water/zoned rs30. * * 05-12-99 application for soil evaulation for lot 27 @0.81ac /wilson farm sub/preliminary plat by mayor of summerfield /rs30 /community water ...ame 05-12-99 sent to surveyor: hugh creed assoc. @ 275-9826.ame 05-27-99 sent to hlth ...ame 5-15-01 layout for new sfr/lot 27 @ 0.81 ac...ih 5-15-01 submitting plans for new sfr.contact belinda covington @ 644-6801....ih 05-29-01..called belinda (only one set of plans submitted for plan review) hold until receipt of second set /jcl. plan reviewed by jcl 05-30-01 (additional set of plans required prior to issuing of permit) /jcl. 2 story sfr/garage/porch/lot 27/wilson farm sub/bruce twp community water/zoned rs30.....loaded by tmb. 6/22/01 rel ss to gso/duke--zh billed northgate builders 30.00 extra trip fee for 2nd failed 127 inspection and sent inspection fee letter/ 8-10-01/gw 08-20-01--rel rough to gso/dk per 163/sm 8/22/01 - per 123 fuel pipe cntr is wades oil (1915)/cs 8/22/01 - per 123 hvac contr is wades oil (1915)/cs 10/5/01 - keyed 30 day temp for const use only to duke/g @ 10:13am - cs released to png/gbo susan 10-19-01/gw 10-31-01 keyed final power to duke/gso, printed & mailed co /smw

Valuation: $2,050,680,000

Fee: $1,378.70 paid to Guilford County, North Carolina

Client: Sessoms Development, Inc

Permit #: H0116396RBLD

6995 Sydney Ct, Summerfield, NC 27358

Contractor: Wade's Oil Company, Inc.

Date: May 19, 1999

Permit type: New Construction

Description: 2 story sfr/4 bdrms/2.5 bths/gar/2 por/lot 54/wilson farms *sub/bruce twp. * * preliminary plat for lot 55/wilson farm sub by les eger 5-19-99/gw sent to donnie newtons desk 5-19-99/gw 3-22-01 lay out for new sfr..ih 3-22-01 submitting plans for new 4bdrm sfr.contact ronnie johnson @ 644-6801.....ih plan reviewed by jcl 04-11-01 keyed ss to gbo duke 4-19-01/gw 7/2/01 - billed c & m for 2nd failed 515/cs 7-2-01 rel rough to gso/dk per160/jm 7/2/01 - per 123 fuel pipe contr now wades (1915)/cs 7/5/01 - billed northgate for 2nd failed 125/cs 7/11/01 - insulation mecheck on file downtown. 155/cs 7/23/01 - keyed 30 day temp const use only per 160 keyed to duke/g @ 9:16am - cs released to png/gbo susan 8-9-01/gw 8/15/01 - printed & mailed co. keyed final to duke/g @ 8:43am- cs

Valuation: $1,790,320,000

Fee: $1,320.30 paid to Guilford County, North Carolina

Client: Sessoms Development Inc

Permit #: H0116518RBLD

6988 Saratoga Ct, Summerfield, NC 27358

Contractor: Gentry Air, Inc.

Date: May 19, 1999

Permit type: New Construction

Description: 2 story sfr/garage/porches/septic 9905745/community well/ *lot 100/wilson farm sub/bruce t/ * * preliminary plat for lot 100/wilson farm sub by les eger 5-19-99/gw sent to donnie newtons desk 5-19-99/gw plans submitted 2-18-2000/contact contractor northgate builders inc/dan panknin 382-1823 code 7928/gw plan approved k.clarke 02-24-00 setback from front property line from 96 to 99 ok per randy duncan health dept and 10.3 off left side/ok 4-13-00/gw 6/15/00 - rel ss to duke/g @ 11:30am/cs 6-15-00 rel rough to gso/dk @ 11:56 per 160/ih 6/22/00 - per 123 gentry now fuel pipe & mech contrctr/cs 8-21-00 billd c & m elect $30 for 2nd failed 560 per 163/ih 8/23/00..keyed temp power to gso duke for 30days for construction use only not to occupy b4 co..163/gmh 11/17/00 - printed and mailed co. keyed final to duke/g @ 8:16am - rel to png/g susan @ 8:30am - cs

Valuation: $1,535,160,000

Fee: $1,319.10 paid to Guilford County, North Carolina

Client: Northgate Builders Inc

Permit #: H0116554RBLD

7841 Spencer Brook Dr, Summerfield, NC 27358

Contractor: Clayton, Tony Pearson

Date: May 19, 1999

Permit type: New Construction

Description: 2 story sfr/basement/garage/porches/deck/septic 9905728/ *community well/lot 90/wilson farm sub/bruce twp/gw * * preliminary plat for lot 90/wilson farm sub by les eger 5-19-99/gw sent to donnie newtons desk 5-19-99/gw layout 3-3-03/gw plans submitted 3-3-03/contact perennial building corp/ allen douglas 215-1815 or james yopp 382-2083/code 8598/gw plan reviewed by jcl 03-14-03 keyed ss to gbo duke 3-31-03/gw new setback change to 91 from front property line and 12 on left ok per d newton 6-3-03/gw 6-10-03 bill'd perennial bldg $55 for failed 125 per 175...i h 6-12-03 bill'd perennial $55 for failed 125 per 156...ih 6-16-03 bill'd $55 for failed 125 per 175...ih 8-18-03 billed $55 to c & m elect for 2nd failed 520/smw application on file for temp power and fee of 55.00 paid sent application to bobby fosters desk 8-18-03/gw keyed 30 day temp to gbo duke for const use only 8-18-03/gw 8-20-03 rel meter to png/gso w/susan.177...ih 8-22-03 keyed final to duke/gso, rpinted & mailed co/smw

Valuation: $2,554,020,000

Fee: $2,547.00 paid to Guilford County, North Carolina

Client: Perennial Building Corp

Permit #: H0116528RBLD

7834 Wilson Farm Rd, Summerfield, NC 27358

Contractor: Gentry Air, Inc.

Date: May 19, 1999

Permit type: New Construction

Description: Area 7 * * *2 story sfr/w/gar/deck/porch/lot 51/wilson farm sub/cmty *well/bruce twp/ih/tmb. * * preliminary plat for lot 51/wilson farm sub by les eger 5-19-99/gw sent to donnie newtons desk 5-19-99/gw 12-05-01 6996 sydney ct has been changed to 7834 wilson farm rd..per environmental health the house is now facing wilson farm rd...ih 12-5-01northgate builders took care of the envr.health..ih 12-5-01 submitting plans .contact:belinda covington @ 644-68 01....ih plan review by bm 12/13/01,refer to permit#117166 12/18/01 loaded by tmb. 12/18/01 contacted belinda covington, advised permit was ready, need gold copies & rec deed/tmb. 1/24/02 - keyed ss to duke/g @ 8:45am - cs 2-19-02 jones plumbing now doing this job/smw 3/19/02- keyed rough to duke/g @ 10:07am- cs 4/5/02 - keyed temp to duke/g @ 10:27am- cs released to png/gbo susan 5-3-02/gw area 7 5/6/02 keyed final to gso duke. printed & mailed co.ke

Valuation: $2,562,720,000

Fee: $1,509.90 paid to Guilford County, North Carolina

Client: Northgate Bldrs, Inc

Permit #: H0116510RBLD

6993 Sydney Ct, Summerfield, NC 27358

Date: May 19, 1999

Permit type: New Construction

Description: 3 story sfr/w/gar/porch/(ub)-bsmt/lot 54 wilson farms sub/ *septic/bruce twp/tmb * * preliminary plat for lot 54/wilson farms sub/by les eger 5-19-99/gw sent to donnie newtons desk 5-19-99/gw 12/18/01 set up for layout for new sfr/lot 54/wilson farm sub/tmb 12/18/01 submit plans for new sfr/lot 54/wilson farms sub contact b. covington/northgate bldr at 644-6801/tmb plan review by bm 12/27/01,refer to permit #116541 12/27/01 lft msge at 644-6801 for (belinda) permit ready for p/u need rec deed & gold copies (3:35 pm)/tmb 1/24/02 - keyed ss to duke/g @ 8:42am- cs 3/22/02 per phil @ jones plumb they are plumb cont. ke 3-27-02 rel rough to gso/dk per160/jm 4-17-02 released 30 day temp power to duke/gso for const use only/smw 05-20-02 keyed 30 day ext of temp power to dk/gso. lj 5/22/02...keyed extended temp power to gso duke per 164/gmh 06-20-02 rel gas meter to marie @ png/gso. lj 6-25-02 extended 30 day temp power to duke/gso for const use only/smw 7-25-02 ok to extend 30 day temp pwr to gso/dk @ 9:48 per 16 0...ih 08-08-02 all finals passed, all fees paid, issued and mailed co. keyed final power to dk/gso. lj

Valuation: $2,166,100,000

Fee: $1,151.85 paid to Guilford County, North Carolina

Client: Sessoms Development Inc

Permit #: H0116517RBLD

7841 Wilson Farm Rd, Summerfield, NC 27358

Date: May 19, 1999

Permit type: New Construction

Description: 2 story sfr/w/gar/screened por in back/front por/lot 47 *septic/cmty well/bruce twp/vol 7/tmb * * preliminary plat for lot 47/wilson farm sub by les eger/ 5-19-99/gw sent to health dept 5-19-99/donnie newtons desk/gw 02-05-02--submitted plans for lot 47/wilson farm sub/contact belinda at 644-6801/sm plan review by bm 2/7/02,refer to permit 106677 02/07/02 loaded by tmb/ 02/08/02 contacted belinda:advised plans were ready for p/u need gold copies & deed or letter/tmb 2-25-02 keyed ss to duke/gso/smw 4-4-02 keyed rough to duke/gso/smw 4/12/02 - billed northgate for 2nd failed 125/cs 5/3/02 - keyed 30 day temp to duke/g @ 8:48am - cs 06-24-02 rel gas meter to susan @ png/gso. lj 8/15/02 keyed final final to gso duke. printed & mailed co.ke

Valuation: $1,951,200,000

Fee: $1,385.90 paid to Guilford County, North Carolina

Client: Sessoms Development Inc

Permit #: H0116504RBLD

7842 Spencer Brook Dr, Summerfield, NC 27358

Contractor: Clayton, Tony Pearson

Date: May 19, 1999

Permit type: New Construction

Description: 2 story sfr/basement/garage/porch/septic 9905732/community *well/lot 92/wilson farm sub/bruce t/gw * * preliminary plat for lot 92/wilson farm sub by les eger 5-19-99/gw sent to donnie newtons desk 5-19-99/gw 11/16/01 - plans submitted/perennial properties/contact james yopp 382-2083/code plan review by bm 11/29/01 12/11/01 - keyed ss to duke/g @ 9:56am cs 2/20/02 - keyed rough to duke/g @ 3:54pm - cs 2/26/02 billed mark locke $30 for 2nd failed 127.ke 05-03-02 keyed temp power to dk/gso for construction use only per 129. lj 05-13-02 billed mark locke $30 for 2nd failed 125. lj 05-14-02 billed gantry air $55 for 2nd failed 425. lj 5/20/02 billed pernnial for 3rd failed 125/cs 05-23-02 all finals passed, all fees paid, issued and mailed co. keyed final power to dk/gso. rel gas meter to susan @ png/gso. lj 6/19/02 sent fee transfer memo to finance. transferred $55 from gentry air to buck moore svcs. receipt #120225.ke 6-20-02 transfer memo sent to finance. mjb

Valuation: $2,441,900,000

Fee: $1,658.60 paid to Guilford County, North Carolina

Client: Perennial Properties Inc

Permit #: H0116531RBLD

7839 Spencer Brook Dr, Summerfield, NC 27358

Contractor: Air Comfort Company, Inc.

Date: May 19, 1999

Permit type: New Construction

Description: 2 story sfr/garage/porch/deck/bonus room/septic 9905727/ *community well/lot 89/wilson farm sub/bruce t/ * * preliminary plat for lot 89/wilson farm sub by les eger 5-19-99/gw sent to donnie newtons desk 5-19-99/gw 10/26/00 - plans submitted by carolina landmark/contact kevin mitteish 669-4149/605-1881/(8043) - cs setback change ok for 10' right offset per donnie newton 11-8-00/gw 12-8-2000 rel ss to gso/dk per121/jm 2/1/01--billed air comfort for failed inspec./ff 2/2/01 - keyed rough to duke/g @ 10:47am - cs 2/5/01-billed cdc electric saw service insp/zh 2/8/01 - billed carolina lanmarks for 2nd 125 - engr's letter on file. 155/cs 4/6/01 - rel to png/g susan @ 2:00pm no permit at this time for gas logs. cs 4/6/01...keyed 30days temp power to gso duke per 163 do not occupy before co... 163gmh 4/27/01 - printed and mailed co. keyed final to duke/g @ 10:20am - cs

Valuation: $1,591,600,000

Fee: $1,360.60 paid to Guilford County, North Carolina

Client: Carolina Landmarks

Permit #: H0116527RBLD

All data is collected from public records. We do not guarantee accuracy of information.