478 Sequoia Ave, San Mateo, CA 94497
Contractor: Capps Homes Inc
Date: May 2, 1996
Permit type: New Construction
Description: New 2 story single family residence with attached 2 car garage and decks (see bld96-0457 for 2nd unit) resubmittal # 1 - jpb - 05/28/96 - landscaping and driveway plan.
Valuation: $546,000
Fee: $7,591.54 paid to City of San Mateo, California
Parcel #: 069353340
Permit #: BLD96-0456
484 Sequoia Ave, San Mateo, CA 94497
Contractor: Capps Homes Inc
Date: Jul 24, 1996
Permit type: New Construction
Description: New single family residence with attached 2 car garage. resubmittal # 1 - jpb - 08/21/96 - as requested by winfred in his letter dated 08/15/96.
Valuation: $701,200
Fee: $7,650.60 paid to City of San Mateo, California
Parcel #: 069353760
Permit #: BLD96-0926
640 Miramar, San Mateo, CA 94403
Contractor: Joe Guntren
Date: Aug 23, 1996
Permit type: New Construction
Description: New sfd new sfd construction of a new single family dwelling on a 10,500 square foot vacant parcel. the project complies will zoning setback requirements.
Parcel #: 048073010
Permit #: ENV96-0217HIST
1280 Laurel Hill Dr, San Mateo, CA 94497
Contractor: Sun Construction
Date: Sep 24, 1996
Permit type: New Construction
Description: New one car garage with breezeway - minor elec.
Valuation: $48,000
Fee: $271.54 paid to City of San Mateo, California
Parcel #: 041292200
Permit #: BLD96-1261
735 2Nd Ave, San Mateo, CA 94497
Date: Nov 27, 1996
Permit type: New Construction
Description: New warehouse with offices, restrooms and 2 mezzanines. resubmittal # 1 - jpb - 03/19/97 - change to frame of structure - no change to size. resubmittal # 2 - jpb - 03/28/97 - change to foundation notes and design. resubmittal # 3 - jpb - 04/24/97 - as requested by winfred in his letter dated 04/09/97. resubmittal #4 04-24-97 - handicap parking revision # 1 - jpb - 10/15/97 - relocate furniture inspection area and change layout of office # 2.
Valuation: $1,949,500
Fee: $47,141.55 paid to City of San Mateo, California
Parcel #: 060011060
Permit #: BLD96-1576
5 Stoney Point Pl, San Mateo, CA 94497
Date: Mar 11, 1997
Permit type: New Construction
Description: Removal of 2 trees removal of two willow trees located in the rear yard of a corner lot. these trees have damaged the concrete walkway and pool deck. the replacement trees will be planted in the side yard, adjacent to the roadway.
Fee: $108.00 paid to City of San Mateo, California
Parcel #: 041162270
Permit #: TRT97-0015HIST
2153 Queens Ln, San Mateo, CA 94497
Date: Mar 11, 1997
Permit type: New Construction
Description: 19" oak removal of a diseased oak tree located in the rear year. the removed tree would be replaced with a redwood.
Fee: $54.00 paid to City of San Mateo, California
Parcel #: 041193080
Permit #: TRT97-0014HIST
767 5Th Ave, San Mateo, CA 94497
Date: Mar 19, 1997
Permit type: New Construction
Description: 2nd unit proposal to construct a 422 sq. ft. second dwelling unit on second story above proposed two-car garage.
Parcel #: 060014030
Permit #: DSR97-0027HIST
444 1St Ave, San Mateo, CA 94403
Contractor: Michael Murphy
Date: May 27, 1997
Permit type: New Construction
Description: New bed + breakfast allow 5 foot wide access in lieu of on-site parking.
Fee: $880.00 paid to City of San Mateo, California
Parcel #: 048015080
Permit #: OSP93-0001HIST
455 1St Ave, San Mateo, CA 94497
Date: Jul 29, 1997
Permit type: New Construction
Description: New sfd new home that will be more than 20 feet from the intermittent creek
Fee: $1,907.00 paid to City of San Mateo, California
Parcel #: 047013340
Permit #: CDP95-0047HIST
695 5Th Ave, San Mateo, CA 94497
Date: Sep 4, 1997
Permit type: New Construction
Description: Residential care residential care use permit renewal for the continued operation of a residental care facility.
Parcel #: 060034030
Permit #: ENV97-0192HIST
111 Highland Ave, San Mateo, CA 94497
Contractor: K N Properties
Date: Jan 6, 1998
Permit type: New Construction
Description: New 2 story single family dwelling with attached garage and decks. 05-18-98 wyt resubmittal per comment letter dated april 20, 1998. revision #1 03/30/99 - mjp addition of deck to project
Valuation: $1,098,000
Fee: $10,149.56 paid to City of San Mateo, California
Parcel #: 047036380
Permit #: BLD97-1959
119 Harvard, San Mateo, CA 94497
Date: Apr 10, 1998
Permit type: New Construction
Description: Lgt industrial park reconsideration of new design since 1992. light industrial park.
Parcel #: 047031310
Permit #: CDP90-36HIST
119 Harvard, San Mateo, CA 94497
Date: Apr 10, 1998
Permit type: New Construction
Description: Lgt industrial park lgt industrial park case closed - no use permit needed based on revised uses reconsideration of new design since 1992. light industrial park, also dsr, + cdp.
Parcel #: 047031310
Permit #: USE90-6HIST
119 Harvard, San Mateo, CA 94497
Date: Apr 10, 1998
Permit type: New Construction
Description: Industrial buildings industrial buildings two new industrial buildings with a caretaker's quarters.
Parcel #: 047031310
Permit #: ENV97-0291HIST
432 Coronado, San Mateo, CA 94497
Contractor: Fitzpatrick Construction
Date: Jul 29, 1998
Permit type: New Construction
Description: Two story single famly dwelling with attached garage and rear deck. resubmittal #1 07-30-98 wjc - boundary survey resubmittal # 2 - jpb - 08/21/98 - grading and drainage plan. resubmittal # 3 - jpb - 11/06/98 - as requested by winfred in his letter dated 10/28/98. revision #1 - 03/12/99 eta - submitting plans per field revision, s2: change to joist. revision #2 - 04/13/99 eta - minor design changes. revision #3 - 5/13/99 kpa - change from conventionally framed roof to trusses. resubmittal #1 (to revision) - 05/20/99 eta - submitting s3 & s4 per winfred's comment letter dated 5/18/99.
Fee: $10,813.49 paid to City of San Mateo, California
Parcel #: 048025400
Permit #: BLD98-1079
432 Coronado, San Mateo, CA 94497
Contractor: Tom Carey
Date: Aug 23, 1998
Permit type: New Construction
Description: Sfd new home with two car garage.
Fee: $749.00 paid to City of San Mateo, California
Parcel #: 048025400
Permit #: CDP98-0045HIST
117 Harvard, San Mateo, CA 94497
Date: Sep 4, 1998
Permit type: New Construction
Description: Two story commercial building with two bathrooms. resubmittal # 1 - jpb - 02/25/00 - as requested by winfred in his letter dated 02/16/00.
Fee: $4,837.84 paid to City of San Mateo, California
Parcel #: 047031310
Permit #: BLD98-1285
511 Cypress Ave, San Mateo, CA 94497
Date: Sep 30, 1998
Permit type: New Construction
Description: Sfd sfd new one story home to utilize existing well.
Parcel #: 037174450
Permit #: ENV98-0278HIST
511 Cypress Ave, San Mateo, CA 94497
Date: Oct 13, 1998
Permit type: New Construction
Description: Sfd new one story home to utilize existing well.
Parcel #: 037174450
Permit #: DSR98-0146HIST