Foundations Permits in Hagerstown, MD

1320 Yale Drive, Hagerstown, MD 21742

Sponsored by Rehold
Information About Property

Date: Apr 16, 1992

Permit type: Foundations

Description: Eastern elementary school . . . . . . 8-10-92 noted on plans in field, area that was ok to pour, advised lonnie cook of morgan keller that copies of all test results would be needed.8/11/92 noted on plans in field, area that was ok the field man from the board of education advised me that pentrometer test were being done because they were on virgin soils. 8/17/92 footings approved for line 4 and 5, row a. area marked on office trailer plans (wkv) 8/18/92 partial footing row 2-sec a-b. (wkv) 8/19/92 partial footing row 1 line a-e. some interior footing on line b (wkv) 8/20/92 partial footing row 1 e-g column g line 4-5 8/21/92 column g,h,k, row 5 column g row 2-4 8/24/92 column l,j,k, row 2 column k-l row 5 to exterior perimeter footing 17-19 8-25-92 partial footing to column 20 approved wkv 8/26/92 footing and foundations - columns and footings 20-27 and rows m-p 8/27/92 rows r-v columns 25-29 piers and foundations 8/31/92 rows 2-z columns 18-15 piers and footings 9/1/92 column 14 s-z piers and footings 9-18-92-ftr-jrs--(1)steel not in holes. advised lonnie to remove loose dirt & mud from bottom of piers also to remove debris from bottom. will stop back at 1:30. (2)pier c-26 ok steel ok advised to use smaller steel supports are using pieces of concrete. 9-18-92-othr-jrs--piers c-25,24,22 steel ok. had men remove some loose dirt. ok to pour. 9-21-92-ftr-jrs--(1)4 piers column (2)hair pins in place for slab every 4 block fill w/correct steel. 9-23-92-ftr-grm--pier bases ok to pour. noted on plans. 9-24-92-ftr-jrs--columns g-l piers ok steel placement ok installing flashing in block also advised 2nd time about pier in line g to grout so steel not exposed. 10/6/92-other-elp-ap-approved 5 lb air test @ 15 minutes on storm drain 10-15-92-fnd-jrs--walk thru-flashing installed started walls at gym-are taking down, not right. all piers and footers completed. added stone inside. starting to prepare for slabs, steel being set. 10-26-92-slab-grm--ok to pour at d-wing (2 sect) wire & vap barr. 10-27-92-slab-grm--ok to pour at d-wing (1 sect) wire & vap barr. 10-27-92-slab-grm-ok to pour at b-wing (1 sect)-- wire & vap barr. 11-5-92-slab-grm--ok to pour 2 sects at area c vap & wire. 11-09-92-slab-jrs--no slabs ready, advised to stop back thursday. 11-18-92-slab-jrs-(1)poly & wire ok stone has been tamp. (2)bond beam around school ok. 2 rods #5 wall pour 4 center w/ 1 rod #5. (3)gym 3/4 way done bond beam poured. 11-24-92-slab-jrs--wire & poly ok. turn down slab ok per drawings. steel in place north end next to gym area. 12-4-92-slab-jrs--footer in slab per drawing with steel & wire. poly ok east section. 12-8-92-slab-jrs--wire & poly turn down footer ok steel in place gym area. 12-9-92-slab-jrs--gym ok wire & poly. steel in turn down ok. 1-5-93-slab-jrs--(1)electrical & mech room slabs. (2)steel in turn down ok wire & poly (3) partial slab-gym. (4)most of steel set. starting to lay brick. all rubber flashing in at base and above windows & doors. (5)starating to install roof skin. (6)inside walls started. some grouting. (7) installing pressure treated wood on facing outside. 1-22-93-slab-jrs--was party poured. (1)slab for rest of gym ok, wire & poly ok. (2)slab area at office had been poured prior to insp. lonnie advised me poly & wire ok was in place. (3)steel beam too short in center hall. had to modify on site. requested cert on work.will have by next week. also advised i needed paper work on all steel & welds that eng. co.has approved for my records. (4)inside walls still under construction. looked at webs to be poured.----- (5)bond beams ok. workman still laying brick. flashings in place. need to check weep holes about half of ceiling installed. (6) rubber membrane on roof edge. 1-28-93-frm-jrs--(1)partial. appears to have missed one bar joist in gym, advised school board & foreman to check to see if i am right. (2)slab poly & wire ok. trun down ok. (3) insu. behind brick on top of gum wall. (4)inside walls are going up checking steel every 4 & are grouting. 2-05-93-slab-grm-nr-due to weather-reinspect 2/9/93 2-9-93-slab-jrs--(1)air cond. pad ok. (2)steel in place has insu blanket to cover. 2-4-93-slab-jrs--(1)air cond pad, steel per drawing. (2)was advised by tony bar joist in question was ok and in place. (3) wall thru all flashing & weep holes in place below 9 above windows plastic tube used for weep holes. (4) interior was grouting & steel partial. 2-17-93-othr-jrs--(1)walk thru. block being installed. all walls are covered ok heat is installed. (2)roof top access installed check book to see what clear opening is to be. 3-12-93-frm-jrs--(1)partial walk thru with kelly (2) advised lonnie needed drawing on beam that was mofified and paper work on steel bolts are torqued. 3-31-93-frm-jrs-(1) was given cert drawings on 3 changes made in structure steel are in main file. (2)talk to mike from school board, advised i need cover letter on bolts from them to review w/bill vantz. will send letter when bolts are complete (3) are starting to install smoke walls4-14-93-frm-jrs--smoke walls & walls in rooms around plumbing pipes. 5-14-93-r/plumb-rwe--bill $20.00 re-inspt fee. (1) p-905.5 laundry tray vent must rise 6" vertically above flood level rim of sink before horizontal offset. (2) p-517.3 install brass nipple at w/heater supply. (3)p-904.1 install main vent thru roof. extend s/joint at lav inside wall. install tub & diverter (pressure balance). 5/17/93-framing-jrs-co-all foam in sofit area is to be encapulated or removed to comply with section 9280 boca. 5-20-93-othr-jrs-metting with kelly and lonnie, bushey had rep on site. foam in sofit area was app. by kelly and larry isminger, but have to draft stop at each column line. eew 5-17-93 final on water and sewer connection approved elp 7-19-93-othr-jrs--walk thru--offices are occupied. advised to vacate. 8-9-93-fnl bldg-jrs--(1)all work complete in wing a & b are setting up tables & work area. (2)walk thru w/doc & lonnie, kelly. (3)have verbal from fire marshal 8-10-93-fnl plum-elp--(a)need backflow preventors in kitchen area. (b)3-comp sink in kitchen area needs an air gap on the drain. (c)indirect waste pipe on 3 comp sink needs hangers. (d)need to adjust hot water temp thru out the bldg. (e) install back flow preventors on water supply to boiler. (f)insulate water & waste lines under handicap sinks-all. (g)improper distances on waste closets, varied 13 1/2" to the min allowed of 15". (h)handicap water closet did not meet the min reqd distance of 18" from sidewall to center (varied from 15 1/2" to 19" (i)need to mark water lines on discharge side of backflow preventor (non potable water). (j)special sinks need to be connected to plumbing system (drains were not properly capped off) (k)need to install a partion between fixtures to assure privacy water closet/urnial in classroom. (l)faucet handles are not handicap approved. 8-10-93-fnl mech-gla--classrooms & halls only. mech rms not complete em.gen & boiler incl. missing parts--baro dampers etc. 8-12-93-se-elp--met with school bd. officers about some plumbing problems. 8-25-93-fnl plum-elp--(1)need to insulate sinks in class rooms (2)need handicap handles on sinks in class rooms (3) need valve chart posted on wall in mechanical room. (4)need a handicap seat mounted in shower. 11/10/92-other-lam-ap-partial underground in parking lot-aas 9-9-93-fnl plum-elp-need to insulate trap class room 120. had to order covering. 9-10-93-fnl bldg-jrs-site work not complete, need final mech. 9-13-93-fnl mech-gla-where is barometric damper on the first boiler? call me in the morning. 9-13-93 final plumbing approved elp/vpw 8/12/94 final bldg jrs u&o/kas

Valuation: $452,562,500

Client: Board Of Education

Parcel #: 05014120700000

Permit #: 92-2477

1320 Yale Drive, Hagerstown, MD 21742

Sponsored by Rehold
Information About Property

Contractor: Dennison Herbert M Jr

Date: May 22, 1992

Permit type: Foundations

Description: Entrance to elementary school 2/3/94 need letter from rollin craig for roadway repair.havent recd as of this date-jwp iii no letter mailed-slt 6/7/94 ok to release per dean lowry-slt 6/20/94 closed-slt

Client: Board Of Education

Parcel #: 05014120700000

Permit #: 92-3571

11905 Wheatfield Drive, Hagerstown, MD 21740

Sponsored by Rehold
Information About Property

Date: Dec 18, 1995

Permit type: Foundations

Description: Construct commercial entrance to serve future warehouse tenants 8/7/97 referred to engineering-lar 8/8/97 not acceptable as is-lcs 9/29/97 requested copy of letter that should have been mailed to property owner-sls 9/29/97 received copy of letter-sls 1/8/98 ok to release per lcs/pp-sls

Client: Dueck Dale K & Beulah A

Parcel #: 04802082300000

Permit #: 95-8431

13508 Overhill Drive, Hagerstown, MD 21742

Sponsored by Rehold
Information About Property

Contractor: B J Builders

Date: Apr 29, 1997

Permit type: Foundations

Description: 12x34 grade level slab, no footing spring valley, section b, lot 79 . . . . . . 10/22/97 changed to a grade level slab, same size-jrs 10/29/97 u&o-sls

Valuation: $250,000

Client: Trace Robert J Jr

Parcel #: 02514075000079

Permit #: 97-3003

18400 Precision Place, Hagerstown, MD 21742

Sponsored by Rehold
Information About Property

Contractor: Frederick Seibert & Associates

Date: Nov 3, 2008

Permit type: Foundations

Description: Simplified forest stand delineation rev 1

Fee: $265.00 paid to Washington County, MD

Client: Bowman North, Llc

Parcel #: 02416069800000

Permit #: FS-08-044

All data is collected from public records. We do not guarantee accuracy of information.