1442 Cameo Dr, Tustin, CA 92780
Date: Oct 1, 2010
Permit type: Electrical
Description: Upgrade electrical pannel to 200 amp from 100 amp same location
Fee: $266.00 paid to County of Orange, California
Client: Phill Bates
Permit #: EL100347
14512 Clarissa Ln, Tustin, CA 92780
Contractor: J Serna Construction And Remodeling
Date: Oct 28, 2010
Permit type: Electrical
Description: Relocate and replace 200 amp panel
Fee: $266.00 paid to County of Orange, California
Client: Victor Valencia
Permit #: EL100359
14611 Clarissa Ln, Tustin, CA 92780
Contractor: Verengo Inc
Date: Nov 17, 2010
Permit type: Electrical
Description: Electrical panel upgrade to 125amp from 100amp
Fee: $266.00 paid to County of Orange, California
Client: Miguel Juarez
Permit #: EL100428
1422 Sierra Alta Dr, Tustin, CA 92780
Date: Jan 12, 2011
Permit type: Electrical
Description: Remove, replace and relocate service meter to approved edison location.
Fee: $266.00 paid to County of Orange, California
Client: Grant Trillwood
Permit #: EL110038
12962 Browning Av, Tustin, CA 92705
Contractor: Orange Innovation Inc
Date: Mar 15, 2011
Permit type: Electrical
Description: Remove, relocate and upgrade service panel from 100-200amp.
Fee: $266.00 paid to County of Orange, California
Client: Patrick Mac Namee
Permit #: EL110051
12801 Elizabeth Wy, Tustin, CA 92780
Contractor: Progressive Power Group Inc
Date: Apr 12, 2011
Permit type: Solar
Description: New roof mounted solar pv system with 36 panels and 1 inverter (486 sqft)
Fee: $16.00 paid to County of Orange, California
Client: William Bisaha
Permit #: SL110056
13021 Chirping Sparrow, Tustin, CA 92780
Date: Apr 20, 2011
Permit type: Solar
Description: New trina solar pv panels mounted on roof top of existing sfd - 9 panels - wires to 3000 watts 1) inverter w/15 amp a/c disconnect & new 15 amp breaker placed @ front of house on roof
Valuation: $572,600
Fee: $16.00 paid to County of Orange, California
Client: Arun Srinath
Permit #: SL110055
12388 Zig Zag Wy, Tustin, CA 92780
Date: Apr 21, 2011
Permit type: Electrical
Description: Upgrade and relocate main service panel from 100 amp to 200 amp (relocated to west wall of house). existing 100 amp panel to remain as subpanel .
Fee: $266.00 paid to County of Orange, California
Client: Washington R E Investments Llc
Permit #: EL110138
17791 Orangetree Ln, Tustin, CA 92780
Contractor: Key Electric Inc
Date: Apr 25, 2011
Permit type: Electrical
Description: New electrical to existing sfd - upgrade existing 100 amp panel to 200 amp electrical service main. like for like in the same location at rear of sfd.
Fee: $266.00 paid to County of Orange, California
Client: Janet/Chuck Olsen
Permit #: EL110216
17861 Martha Anne Dr, Tustin, CA 92780
Contractor: Straight Line Construction Services
Date: May 5, 2011
Permit type: Electrical
Description: Remove, and upgrade service panel from 100-200 amps. same location
Fee: $266.00 paid to County of Orange, California
Client: Paul Zumberge
Permit #: EL110241
17791 Orangetree Ln, Tustin, CA 92780
Contractor: Beard Electric
Date: May 6, 2011
Permit type: Electrical
Description: Installation of electrical vehicle charger unit on exterior wall of garage per plan. see attach plan
Fee: $341.00 paid to County of Orange, California
Client: Charles Olsen
Permit #: EL110249
12402 Woodlawn Av, Tustin, CA 92780
Date: Jun 2, 2011
Permit type: Electrical
Description: Relocate existing 200 amp main service panel to north side of house.
Fee: $266.00 paid to County of Orange, California
Client: Kelly & Sherry Dudley
Permit #: EL110236
12402 Woodlawn Av, Tustin, CA 92780
Date: Jun 2, 2011
Permit type: Electrical
Description: Tempoary power pole for construction site
Fee: $341.00 paid to County of Orange, California
Client: Kelly & Sherry Dudley
Permit #: EL110294
18221 Lucero Wy, Tustin, CA 92780
Contractor: Solarcity Corporation
Date: Jul 7, 2011
Permit type: Electrical
Description: New 125 amp electrical service panel.
Fee: $266.00 paid to County of Orange, California
Client: Russell Johnson
Permit #: EL110372
18231 Beneta Wy, Tustin, CA 92780
Contractor: Jess Stone Electrical
Date: Jul 26, 2011
Permit type: Electrical
Description: Upgrade main service panel, 100 amps to 200 amps. same location
Fee: $266.00 paid to County of Orange, California
Client: Paula Sandy
Permit #: EL110400
1581 Melvin Wy, Tustin, CA 92780
Contractor: Verengo Inc
Date: Aug 1, 2011
Permit type: Solar
Description: New roof-mounted photovoltaic solar system on sfd, 24 panels (341 sqft.) and 1 4.4 kw inverter.
Fee: $16.00 paid to County of Orange, California
Client: James & Serin Shin
Permit #: SL110138
17772 Bigelow Pk, Tustin, CA 92780
Date: Aug 2, 2011
Permit type: Electrical
Description: Install new and upgrade main service panel from 100 amp to 200 amp. relocate to left side of house. existing panel to remain as subpanel.
Fee: $266.00 paid to County of Orange, California
Client: Kevin Massey
Permit #: EL110429
12641 Elizabeth Wy, Tustin, CA 92780
Contractor: Verengo Inc
Date: Aug 8, 2011
Permit type: Electrical
Description: Remove, upgrade and relocate service panel from 100-200 amps to approved edison location
Fee: $266.00 paid to County of Orange, California
Client: Dave Barberi
Permit #: EL110440
12402 Woodlawn Av, Tustin, CA 92780
Contractor: Verengo Inc
Date: Aug 16, 2011
Permit type: Electrical
Description: New roof-mounted photovoltaic solar system on sfd, 20 panels (354 sqft.) and 20 4.128 kw micro-inverters. panels are less than 50% of total roof square footage and will not obstruct fire fighter access, ocfa approval not required.
Fee: $16.00 paid to County of Orange, California
Client: Kelly & Sherry Dudley
Permit #: SL110129
14371 Clarissa Ln, Tustin, CA 92780
Contractor: Solarcity Corporation
Date: Nov 3, 2011
Permit type: Solar
Description: New roof-mounted photovoltaic solar system on sfd, 36 modules (649 sqft.) and 1 8.46 kw inverter.
Fee: $16.00 paid to County of Orange, California
Client: Joesph Poyer
Permit #: SL110200