3668 Bonita Ranch Ct, Bonita, CA 91902

Date: Apr 6, 2005

Permit type: Architecture

Description: Stanford residence--withdrawn 5-11-05 major use permit: minor deviationlinked cases: p00-009m1, p00-009m2, tm 5205 er 9018005a, lp 02-065, cc 03-0060, ba 03-0059description: minor deviation to major use permit for rear yard set back on parcel 64dpw manager:dplu manager:emery mccafferydpw trust:dplu trust:

Parcel #: 590-190-64-00

Permit #: PDS2005-3301-00-009-03

4570 Paseo De La Vista, Bonita, CA 91902

Contractor: Didonato Associates

Date: Jun 8, 2005

Permit type: Architecture

Description: Ss031-01 bonita highlands tank w6 major use permit: cell site modification (w) w6major use permit: modificationlinked cases: p77-099w6, er 91-18-5a, zap 00-105 description: modification for cell site addition of 12 antennas supporting equipment and equipment shelter.dpw manager:beeech, resource kent johnsondplu manager: mccaffery, emery trans to cibit, cathy 10/23/06 trans to maxson, alyssadpw trust:dplu trust: wn 8156

Parcel #: 589-422-50-00

Permit #: PDS2005-3301-77-099-19

3510 Tennis Court Ln, Bonita, CA 91902

Date: Sep 8, 2005

Permit type: Architecture

Description: Henry, tom pre-application meeting (no permit)dpw manager:dplu manager:dplu analyst:dpw trust:dplu kronos account:

Parcel #: 589-100-36-00

Permit #: PDS2005-3992-05-338

3510 Tennis Court Ln, Bonita, CA 91902

Date: Sep 8, 2005

Permit type: Architecture

Description: Bonita park estates general plan amendment authorizationlinked cases: description: proposed zone change from 1 acre to 1/2 acre lotspaa05-013dpw manager:dplu manager: caldwell, stelladpw trust:kronos account:

Parcel #: 589-100-36-00

Permit #: PDS2005-3801-05-013

3620 Wild Oats Ln, Bonita, CA 91902

Date: Sep 20, 2005

Permit type: Architecture

Description: Senteno/bonita highlands major use permit: administrative deviationlinked cases: p72-389description: ad dev from an approved prd plot plan for tileroof patio cover 10x20dpw manager: n/adplu manager: hogan, michaeldpw trust: n/akronos account:

Parcel #: 590-290-30-00

Permit #: PDS2005-3301-72-389-34

3677 Bonita Ranch Ct, Bonita, CA 91902

Date: Dec 2, 2005

Permit type: Architecture

Description: Ames ranch lots 11 & 12 major use permit: minor deviationlinked cases: tpm 20984description: adding 2 single dwellings to plot planspecific plan area:dpw manager: beech-----resource=kent johnsondplu manager: mccaffery, emery trans to cibit, cathy 11/06/06dpw trust: kornos 05-0054530 dplu kronos account: 1002785

Parcel #: 590-190-61-00

Permit #: PDS2005-3301-00-009-04

3550 Proctor Valley Rd, Bonita, CA 91902

Date: Feb 24, 2006

Permit type: Architecture

Description: Dr. benjamin camacho pre-application meeting (no permit)dpw manager:dplu manager:dplu analyst:dpw trust:dplu kronos account: 1006958

Parcel #: 590-230-52-00

Permit #: PDS2006-3992-06-063

6645 Jonel Way, Bonita, CA 91902

Date: Apr 25, 2006

Permit type: Architecture

Description: Andrew zienniak pre-application meeting (no permit)dpw manager:dplu manager: emery mccafferydplu analyst:dpw trust:dplu kronos account: 1006958

Parcel #: 585-113-22-00

Permit #: PDS2006-3992-06-138

3218 Summit Meadow Rd, Bonita, CA 91902

Date: Jun 30, 2006

Permit type: Architecture

Description: Sweetwater regional park the proposed project is a major use permit for an unmanned telecommunications facility consisting of the construction of one faux pine with three-sector panel antenna arrays with four antennas per sector. an existing cluster of pine trees will surround the faux pine tree. total height of the pine tree will be thirty five feet above ground level. one cingular equipment cabinet will be enclosed within a 14-foot by 22-foot by 6-foot equipment shelter with roof and siding to match the existing park building. access will be provided through the existing road and parking facility located on summit meadow road. the property is zoned rr1 (rural residential) which permits wireless telecommunication facilities under the tier 4 classification with an approved major use permit pursuant to section 6985a of the zoning ordinance. the san diego county general plan designates the site as (1) residential.major use permit: cell site mup 06-068linked cases: er 06-19-023description: major use permit for 12 antennas in a proposed faux pine tree.specific plan area: nonedpw manager: barry beech, resource=kent johnsondplu manager: summer waters trans to maxson, alyssadpw trust: kronos 06-0064891 kronos account:

Parcel #: 585-100-21-00

Permit #: PDS2006-3300-06-068

3218 Summit Meadow Rd, Bonita, CA 91902

Date: Jun 30, 2006

Permit type: Architecture

Description: Sweetwater regional park application for environmental initial study (aeis) - largelinked cases: p06-068description: major use permit for 12 antennas in a proposed faux pine tree.specific plan area: nonedpw manager:dplu manager: waters, summer trans to maxson, alyssa 11/8/06dpw trust:kronos account:

Parcel #: 585-100-21-00

Permit #: PDS2006-3910-0619023

7275 San Miguel Rd, Bonita, CA 91902

Date: Nov 8, 2006

Permit type: Architecture

Description: Jeff hunt pre-application meeting (no permit)dpw manager:dplu manager: nick martinezdplu analyst:dpw trust:dplu kronos account: 1006958

Parcel #: 585-120-20-00

Permit #: PDS2006-3992-06-322

3509 Frisbie St, Bonita, CA 91902

Date: Apr 4, 2007

Permit type: Architecture

Description: Reynaldo ruiz minor pre-application meet pre-application meeting (no permit)permit difficulty:specific plan area:description: minor pre-application meeting for site plan c36 "stp b" restaurant extend dining 1,800 and add 42 parking spaces plus new noutside patio area of 200 sqdpw manager:dplu manager: heather stevendpw trust:dplu kronos account: 1006958

Parcel #: 590-140-20-00

Permit #: PDS2007-3992-07-074

5535 Horse Ridge Way, Bonita, CA 91902

Date: Jul 17, 2007

Permit type: Architecture

Description: Castro family day care/ad/14 children administrative permit: family day care home for childrenlinked cases: description: children capacity: 14. hours of operation: 6:00 am to 6:00 pm.specific plan area: nonepermit difficulty:dpw manager:dplu manager: marcus lubichdpw trust:kronos account:

Parcel #: 590-340-03-00

Permit #: PDS2007-3000-07-043

5771 Sweetwater Rd, Bonita, CA 91902

Date: Aug 24, 2007

Permit type: Architecture

Description: Posadas del sol.llc/maa/waiver request mills act applicationlinked cases: p04-002m1permit difficulty:specific plan area:description: request for site plan waiver, "h" designator design reviewmills act application dplu manager:gail wrightkronos account: 1002787

Parcel #: 586-051-03-00

Permit #: PDS2007-3911-07-005

3415 Malito Dr, Bonita, CA 91902

Contractor: Algert Engineering

Date: Aug 29, 2007

Permit type: Architecture

Description: Davila cc certificate of compliance: standardlinked cases: permit difficulty:specific plan area:description: one parcel certificate of compliance for legal lotcase#: c07-0109(c)1date recorded: 20-nov-2007doc#: 2007-0728732dpw manager:dplu manager: marisa smithdpw trust:kronos account: 1006350

Parcel #: 591-140-02-00

Permit #: PDS2007-3720-07-0109

3510 Tennis Court Ln, Bonita, CA 91902

Contractor: Stuart Engineering

Date: Sep 26, 2007

Permit type: Architecture

Description: Bonita park assoc/stivers ranch major pr application for environmental initial study (aeis) - averagelinked cases: 3992 07-103permit difficulty:specific plan area: nonedescription: tm for 5 lotsdpw manager:dplu manager: mark slovickdpw trust:dplu kronos account:

Parcel #: 589-100-36-00

Permit #: PDS2007-3910-0718003

4043 Horton Rd, Bonita, CA 91902

Contractor: Algert Engineering

Date: Oct 18, 2007

Permit type: Architecture

Description: Macie, ba with cc boundary adjustment with certificate of compliancelinked cases: permit difficulty:specific plan area:description: 2 lot boundary adjustment with certificate of compliancecase#: c07-0130ba(c)1date recorded: 13-dec-2007doc#: 2007-0770522dpw manager:dplu manager: kristina jeffersdpw trust:kronos account: 1006351the project is a boundary adjustment to relocate the property line between two existing lots. the project site is located on horton road in the sweetwater community planning group, within unincorporated san diego county. the site is subject to the general plan regional category (cuda) current urban development area, land use designation (1) residential. zoning for the site is rr1; rural residential. the site contains an existing single family dweeling that would be retained. access would be provided by a driveway connecting to horton road. the project would be served by on-site septic systems and imported water from the sweetwater municipal water district.

Parcel #: 592-060-52-00

Permit #: PDS2007-3710-07-0130

6802 San Miguel Rd, Bonita, CA 91902

Date: Feb 21, 2008

Permit type: Architecture

Description: Sweetwater authority major preapp, preap pre-application major meeting (no permit)permit difficulty:specific plan area: nonedescription: major preapplication meeting for mupdpw manager: john thomasdplu manager: gail wrightdpw trust: pw 08-0093129dplu kronos account: plu 08-0093129description; major pre application meeting for a clean (sterile) landfill: the sweetwater authority would like to determine if a major use permit can be obtained from the county to operate a proposed clean landfill and is seeking input from the county to answer this key question. the landfill would be located on vacant land south of san miguel road, and immediately west of interstate 125 in bonita (sweetwater cpg). the material trucked in would be clean dirt only from excavation of trenches by the authority, or its contractor, for water facility improvements. no trash, concrete or asphalt rubble, hazardous waste, or materials other than clean dirt would be trucked to the site. caltrans has provided three conceptual grading scenarios to achieve landfill volumes. they estimate the number of daily trips would vary from none to 20. the annual volume trucked into the new landfill would be approximately 8,000 cubic yards and the estimated duration of this use would range from five to 30 years. no new infrastructure related to water, sewer, gas, telephone or cable would be required and access is assumed to be from an existing frontage road.it appears that the proposed landfill use, due to project design, and anticipated operating characteristics (traffic, noise, air quality) may be incompatible with the surrounding residential land use to the west and south, therefore the required major use permit findings cannot be made at this time. reports would be required with the major use permit application submission that would address air quality, biology, visual/community character, traffic and noise for review by county staff.sweetwater community plan: land use policies - residential item 3 requires a buffer area from incompatible activities which create heavy traffic, noise, lighting, odors, dust and unsightly views. the major use permit would require a study of community character/land use/aesthetics to address those issues and how the project would mitigate to minimize impacts to the residential areas. in addition, the sweetwater land use policies - commercial item 2, a. says in part that commercial development must not interfere functionally or visually with adjacent non-commercial land uses by requiring buffers consisting of walls (or other architectural means), berms, and/or landscaping using native or naturalizing plants. a landfill operation (a major impact service & utility z.o. section 1350) would be allowed under current zoning s90 (holding area use regulation) with the approval of a major use permit. the landfill project would also be consistent with the general plan (22) public/semi public lands. gp 22 says that this designation is consistent with all categories of the regional land use element. general plan update is the same category as the current general plan (22) sweetwater community plan: land use policies - residential item 3 requires a buffer area from incompatible activities which create heavy traffic, noise, lighting, odors, dust and unsightly views. the major use permit would require a study of community character/land use/aesthetics to address those issues and how the project would mitigate to minimize impacts to the residential areas. in addition, the sweetwater land use policies - commercial item 2, a. says in part that commercial development must not interfere functionally or visually with adjacent non-commercial land uses by requiring buffers consisting of walls (or other architectural means), berms, and/or landscaping using native or naturalizing plants.

Parcel #: 585-111-01-00

Permit #: PDS2008-3992-08-029

5771 Sweetwater Rd, Bonita, CA 91902

Contractor: Burkett & Wong Engineers, Inc.

Date: Sep 9, 2009

Permit type: Architecture

Description: Koy builders landscape plan 09-018 landscape plan: standardpermit difficulty:specific plan area: none description: landscape plan for ad 04-059, zap 04-021, rez 04-021dplu manager: dave kahlerdpw trust:kronos account: 1002782

Parcel #: 586-051-03-00

Permit #: PDS2009-3960-09-018

4570 Paseo De La Vista, Bonita, CA 91902

Date: Oct 30, 2009

Permit type: Architecture

Description: Clearwire, ca-sdg5912c, bonita highland, major use permit: cell site modification (w)linked cases: p 77-099w8permit difficulty:specific plan area:description:6 panel antennas and 4 directional antennasthe project is a major use permit modification request to authorize the construction, operation, and maintenance of a wireless telecommunication facility. the project consists of four panel antennas and two directional antennas that would be mounted on an existing water tank located at the northern portion of the subject property. the associated equipment cabinet would be surrounded by an eight-foot high concrete masonry unit (cmu) block wall. the project site is located at 4570 paseo de la vista in the sweetwater community plan area, within unincorporated san diego county. the site is subject to the general plan regional category current urban development area (cuda), land use designation (1) residential. zoning for the site is ru1 (residential). the site is developed with two existing water tanks and four wireless telecommunication facilities that would be retained. access would be provided by a driveway connecting to paseo de la vista. withdrawn january 6, 2010dpw manager:dplu manager: michelle chandpw trust:dplu kronos account:

Parcel #: 589-422-50-00

Permit #: PDS2009-3301-77-099-25