Description:Replace (2) exisitng trane air cooled chillers at the omni parker house hotel located at 60 school street with (2) new multistack air cooled chillers. modify exisitng structural steel per stamped structural engineered sks - 1 thru sks-6
Valuation:$75,100,000
Fee:$7,530.00 paid to City of Boston, Massachusetts