Description:*7-22-13: this project must adhere to sections 27-749 and 27-750 for the maximum two (2) foot build back from the original front door threshold with the ffe at 1006.88. the average front setback of the future new house derived from the adajcent houses. the contractor must follow asbestos protocol per the state of georgia environmental protection division, and the dekalb health department guidelines for rodents before demolition.* demolish structure.