Type:
I Bid On Jobs, Either Concrete Or Glassblock. I Have Another Contractor Rip Them Out And Haul The Materials Away. I Form Up The Job, Prep It, Pour The Concrete And Finish, Cut Lines, And Pull Forms. I Usually Have A Helper. I Pay Per Job (Sub Contract) On