Description:Administration building: change in occupancy designation from storage (s-2) to assembly (a-3) for the use of workout room on the third floor, adjacent to the racquetball courts. installtion of glass wall at existing racquetball courts to hallway a209 on the second floor. installation of new dividing wall on 3rd floor, between workout room and racquetball courts.