Contractors DirectoryInformation on every contractor in United States

Kimley-Horn

1300 Clay Street Ste325, Oakland, CA 94614

Service:
Architecture, Commercial Contracting, Electrical, Miscellaneous, Signage
Employees:
Pilot Travel Center, Llc, KIMLEY-HORN (Owner)

License:
California #5106250712
Status:
Active
City:
Richmond
Type:
Contractor

Verified:
Status:Not verified

Kimley-Horn Additional Information Add Info

No additional information for Kimley-Horn yet.

Reviews Write Review

No reviews for Kimley-Horn yet.

Permits (16)

401 W Colorado Ave, Glendora, CA 91740

Sponsored by Rehold
Information About Property

Date: Dec 11, 2014

Permit type: Plumbing

Description: Abandon sewer connection

Fee: $77.28 paid to City of Glendora, California

Client: Western Pacific Housing Inc

Parcel #: 8640001035

Permit #: B14-1919

401 W Colorado Ave, Glendora, CA 91740

Sponsored by Rehold
Information About Property

Date: Dec 11, 2014

Permit type: Demolition

Description: Demolition: 678 sf residence; 686 sf garage

Valuation: $954,800

Fee: $367.69 paid to City of Glendora, California

Client: Peter A Patti

Parcel #: 8640001035

Permit #: B14-1408

409 W Colorado Ave, Glendora, CA 91740

Sponsored by Rehold
Information About Property

Date: Dec 11, 2014

Permit type: Plumbing

Description: Abandon sewer connection

Fee: $77.28 paid to City of Glendora, California

Client: Western Pacific Housing Inc

Parcel #: 8640001031

Permit #: B14-1920

413 W Colorado Ave, Glendora, CA 91740

Sponsored by Rehold
Information About Property

Date: Dec 11, 2014

Permit type: Plumbing

Description: Abandon sewer connection

Fee: $77.28 paid to City of Glendora, California

Client: Western Pacific Housing Inc

Parcel #: 8640001032

Permit #: B14-1921

417 W Colorado Ave, Glendora, CA 91740

Sponsored by Rehold
Information About Property

Date: Dec 11, 2014

Permit type: Plumbing

Description: Abandon sewer connection

Fee: $77.28 paid to City of Glendora, California

Client: Western Pacific Housing Inc

Parcel #: 8640001033

Permit #: B14-1922

417 W Colorado Ave, Glendora, CA 91740

Date: Dec 11, 2014

Permit type: Demolition

Description: Demolition: 2484 sf sfr; 400 sf attached garage

Valuation: $2,018,800

Fee: $630.23 paid to City of Glendora, California

Client: Peter A Patti

Parcel #: 8640001033

Permit #: B14-1411

427 W Colorado Ave, Glendora, CA 91740

Date: Dec 11, 2014

Permit type: Plumbing

Description: Abandon sewer connection

Fee: $77.28 paid to City of Glendora, California

Client: Western Pacific Housing Inc

Parcel #: 8640001034

Permit #: B14-1923

427 W Colorado Ave, Glendora, CA 91740

Date: Dec 11, 2014

Permit type: Demolition

Description: Demolition: 2507 sf sfr; 1118 sf detached garage

Valuation: $2,537,500

Fee: $755.52 paid to City of Glendora, California

Client: Peter A Patti

Parcel #: 8640001034

Permit #: B14-1412

2490 Border Pacific Dr, San Diego, CA

Date: Sep 4, 2012

Permit type: New Construction

Description: Commercial coach on permanent foundation at a trucking facility.

Valuation: $1,440,000

Client: Siempre Viva Road Dev. Lllp

Permit #: 990154

665 Alta Rd, San Ysidro, CA 92179

Date: Jan 10, 2011

Permit type: Architecture

Description: Coorections corp of america major pre ap major use permit: post-approval conditionspermit difficulty:specific plan area: sp 93-004 spa 006-005 er 93-19-006ll, p 06-074w1description: major pre application correctional facility the project is a major use permit modification to modify the previously approved major use permit (mup 06-074) for a secure detention facility. mup 06-074 was approved by the planning commission on april 10, 2009. the main purpose of the major use permit modification is to move the location of the facility approximately 400 ft away from the previously approved site. other changes include relocating the parking lot, an addition of approximately 20 square feet of building area and minor changes to the layout of the buildings. while the previously approved site was 40 acres, the current site is 37 acres. the capacity of the prison is identical to the previously approved permit (2,132 beds) and construction will occur in two phases. as previously approved, phase 1 would include four buildings to accommodate 1,448 beds and several other support structures and phase 2 would increase the number of beds to 2,132 beds housed in two more detention buildings.the project would be located on a previously graded site. the site has existing, southward facing manufactured slopes up to 40 ft high along the southern and northern site boundaries. an equestrian trail would extend along the eastern and southern site boundaries. a security fence and one-lane paved road would be provided around the perimeter of the site. security fencing would be two-layers deep, and typically would be 16 ft high. a wooden guard-rail would be installed along the side of the perimeter rioad where the road abuts the southern slope. cs1 received 02-mar-2011 satisfiy condition 26 copy of recorded grant dee, condistion 2 notorized recordation form, condition f recorded drainage and access easment and maintenance agreement.lrdplu manager: m. johnston

Parcel #: 648-040-17-00

Permit #: PDS2011-3399-06-074-01

665 Alta Rd, San Ysidro, CA 92179

Date: Mar 16, 2010

Permit type: Architecture

Description: Corrections corp of america major pre ap application for environmental initial study (aeis) - previous ceqa actionpermit difficulty:specific plan area: sp 93-004 spa 006-005, p 06-074w1, er 9319-006lldescription: major pre application correctional facility the project is a major use permit modification to modify the previously approved major use permit (mup 06-074) for a secure detention facility. mup 06-074 was approved by the planning commission on april 10, 2009. the main purpose of the major use permit modification is to move the location of the facility approximately 400 ft away from the previously approved site. other changes include relocating the parking lot, an addition of approximately 20 square feet of building area and minor changes to the layout of the buildings. while the previously approved site was 40 acres, the current site is 37 acres. the capacity of the prison is identical to the previously approved permit (2,112 beds) and construction will occur in two phases. as previously approved, phase 1 would include four buildings to accommodate 1,428 beds and several other support structures and phase 2 would increase the number of beds to 2,112 beds housed in two more detention buildings.the project would be located on a previously graded site. the site has existing, southward facing manufactured slopes up to 40 ft high along the southern and northern site boundaries. an equestrian trail would extend along the eastern and southern site boundaries. a security fence and one-lane paved road would be provided around the perimeter of the site. security fencing would be two-layers deep, and typically would be 16 ft high. a wooden guard-rail would be installed along the side of the perimeter rioad where the road abuts the southern slope. dpw manager:ed sinsaydpw resource: rené vidalesdplu manager: daniella rosenberg

Parcel #: 648-040-17-00

Permit #: PDS2010-3910-9319006LL

1008 Deodar Rd, Escondido, CA 92026

Date: Oct 21, 2009

Permit type: Commercial Contracting

Parcel #: 228-170-01-00

Permit #: PDS2009-4550-4705

1008 Deodar Rd, Escondido, CA 92026

Date: May 5, 2008

Permit type: Commercial Contracting

Description: Area: escondido

Parcel #: 228-170-01-00

Permit #: PDS2008-4500-4705

8774 Approach Rd, San Diego, CA 92154

Date: Mar 3, 2008

Permit type: Commercial Contracting

Description: Cg4633-pilot travel center-piper rch rd area: east otay mesa/san diego improvements to be installed: improvement of piper ranch rd per approved cost estimate and cg4633 signed plan. notes: a) stormwater best management practices (bmps) are required at all times and shall be in accordance with the county's watershed protection ordinance and county director's letter of instruction dli-ld-i. b) obtain an approved traffic control permit prior to start of any work in the county's right of way. please call traffic engineering at (858) 874-4025 for more information. c) compaction shall be achieved by "mechanical compaction" methods and geotechnical compaction reports are required for all compacted sections of the trench, exceptions to compaction testing requirements at the discretion of the director of public works. d) all paved and unpaved paved areas damaged, disturbed, or removed by the work permitted shall be repaired to the satisfaction of dpw's private development construction inspection and road maintenance sections. as shown attached, the only acceptable trench restoration details are regional standard drawing g-24 - type a for asphalt, g-25 - type c for concrete, and g-25 type d for mixed asphalt and concrete sections. in addition, the final surface treatment is to match the existing surface type e) deviations from standard trench restoration requirements must be reviewed and approved by county materials lab prior to start of work. f) if trench exceeds five (5) feet in vertical depth a cal-osha permit is required. please call cal-osha at (619) 767-2280 permittee agrees to indemnify, hold harmless and defend the county and each of its officers and employees from any liability or responsibility for accident, loss or damage to persons or property arising by reason of the work done by permitee, or permittee's agents, employees or representatives.

Parcel #: 646-240-02-00

Permit #: PDS2008-4500-4633

1008 Deodar Rd, Escondido, CA 92026

Date: Oct 12, 2007

Permit type: Commercial Contracting

Description: Area: escondido

Parcel #: 228-170-01-00

Permit #: PDS2007-2540-4705

6589 Lonestar Rd, San Ysidro, CA 92154

Date: Dec 3, 2004

Permit type: Architecture

Description: Pilot travel center --withdrawn 4-8-05 tentative parcel map: standard tpm20894 4 + reminder "pilot travel center"er93-16-006rthe project would create four lots of 12.7 acres, 26, 23.8, and 16.3 acres, respectively. lot 1 (12.7 acres) would be the location for a proposed pilot travel center. the travel center will include a 10,500 square foot building that will house a mercantile area, wendy's restaurant with drive-thru lane, and professional driver amenities such as public showers and laundry. the travel center will provide fuel service to include 8 gasoline dispensers under a canopy, and 8 truck diesel-fueling lanes under a canopy. parking will include 96 spaces including handicap spaces, and 125 truck parking spaces. the travel center will operate 24 hours per day, seven days a week and anticipates a total of 65 employees, 18-20 on each shift. grading is anticipated to total 75,000 cubic yards with a maximum cut slope of 8 feet and maximum fill slope of 10 feet. ingress and egress will be from two driveways on piper ranch road, one for autos and one for trucks. no other development is currently planned for lots 2 through 4, although the proposed lot configuration anticipates sr-125 will utilize lot 3dpw manager:barry beech, ----------------------------------------------------kent johnsondplu manager: hingtgen, robertdplu analyst:dpw trust:dplu trust:wn 7938kimley-horn 619-234-9411 fax 619-234-9433

Parcel #: 646-070-07-00

Permit #: PDS2004-3200-20894

All data is collected from public records. We do not guarantee accuracy of information.