Description:Tenant fit-up for subway.all construction to meet requirements of the 2007 kbc.seating capacity for this location is (49). mezzanine to be used for mechanical platform only replace existing stairs. storage beneath stair approved with installation of sprinkler head along with rated assembly beneath stairs.one hour wall assembly with 20 minute door to storage area.area to be 100% sprinkled. all construction to meet requirements of 2007 kbc.mam
Valuation:$850,000
Client:
Llc C/O Charles W Dobbins Jr Broadbrook Available Data