Description:100 sf interior renovation, alteration, and relocation of 2nd floor stairway of two story single family dwelling of wood frame construction. shall not encroach any easements or required yards. separate permit required for electric. shall comply with 2013 krc including rafter span r802.5; floor joist span r502.3; ceiling joist span r802.4; smoke alarms r317. a permanent energy efficiency certificate completed by the builder or registered design professional showing r-values in zone 4, shall be posted on or in the electrical distribution panel. fenestration (windows & doors) - .35 maximum u value. shall provide written window installation instructions provided by the window manufacturer per r613.1. same shall be delivered to the field inspector. proper tempered glazing to be installed at same area of exterior walls with existing windows. - hh