Description:Phase 2: new 22' x 26', msd control building with truss roof, adjacent to a new underground storage basin, generator & odor control equipment. (see phase one foundation only permit bl951966). this facility will be housing the electrical & mechanical equipment necessary for automated operation of the basin. all construction shall comply with 2013 ky. building code. access off charbdin place leading to a fenced in area with brick column supports, 7 1/2' tall to 8' tall (55' x 83' area). this building will subdivided by a one hr. rated partition & door between electrical room & the control room. man door from each space & one window in control area. preasure treated lumber on the roof will not be used because it corrodes metal place connectors. on grade, a 4' x 13' concrete generator pad & a 11' x 21' odor control pad above an extension of the existing storage basin & valve vault approx. 47'6" below grade. a catwalk & ships ladder will service as access to the below grade equipment. building envelop, electrical & hvac comchecks have been provided.