Rainmaker Sprinkler Systems
25910 Symphonic Hill, San Antonio, TX 78260
Contact Information
Rainmaker Sprinkler Systems Additional Information Add Info
No additional information for Rainmaker Sprinkler Systems yet.
Reviews Write Review
No reviews for Rainmaker Sprinkler Systems yet.
Permits (1)
4627 N Stahl Park, San Antonio, TX 78217
Date: Oct 27, 2015
Permit type: Commercial Contracting
Description: ***prior to commencing work in city row, you must obtain a lane and/or a sidewalk closure permit. contact public works at 210-207-7755 or 210-207-6949. **lz** 2 approaches (one exit, one entry) 20' wide x 8' to pl 5' flares (minimum) area of both approaches 370 sf area of sidewalk 6' x 180' = 1080 sf traffic comments: ***call city construction inspector at 210.207.1111, option 0 prior to commencing any work or pouring concrete. ***refer to sheet c-1e dated and signed by the engineer on 05.02.15 for site layout. ***dial (210) 207-1111 to schedule inspections twenty four (24) hours prior to pouring concrete flatwork and / or traffic (parking) inspections. ***prior to commencing work in city r.o.w. obtain a lane and/or a sidewalk closure permit from public works-traffic engineering. contact john rodriguez at 210.207.7755. once permit is obtained, provide a proper lane closure which is to be set up by a certified barricading company. if these two items are not accomplished, a "stop work order" violation will be issued and work can not commence until the two items have been addressed *** ***temporary construction access drives contact row management at 210.207.7755 for a permit to work in the row **** ***all access driveways shall be provided with clear vision area in accordance with udc 35-506 (d) (5). clear vision areas must be free of visual obstructions, e.g. structures, walls, fences and vegetation which are higher than three (3 ) feet and lower than eight (8) feet above the street pavement. ***impervious cover shall be maintained or constructed as per udc section 35-526 (f) (1) off-street parking, as per udc section 35-526 ( 2) (f) (1) - off-street parking facilities shall be constructed, maintained and operated in accordance with the following specifications: (1) drainage and surfacing. areas shall be properly graded for drainage, surfaced with concrete, asphaltic concrete, or asphalt and maintained in good condition free of weeds, dust, trash and debris. ***city approved plans shall be maintained at the jobsite and be accessible to city inspectors at all times during work activities. ***all concrete work shall comply with cosa standards and specifications
Fee: $230.56 paid to City of San Antonio, Texas
Permit #: 2107612